North Baltimore, Ohio

September 26, 2021 8:32 am

419-581-9629

Leave a message with sports scores or news 24/7/365

Logo
3 panel GIF
March 2020
Gerdeman Ins Jan 2016
Oct. 2018 Update
Ol’ Jenny
Briar Hill Health Update
BVH March 2020
Weekly Specials

ODOT Update: D-1 Oct. 28

ODOT District Two Weekly Construction Update

Updates are highlighted in bold and underlined.

Lucas/Wood Counties

1. Interstate 75: Widening
Wood & Hancock Counties (170-14, 199-14, 237-14 & 3000-14):

Interstate Restrictions:  Through November, overnight, from 7pm until 6am, single lane restrictions are possible on I-75, between the I-75/I-475 interchange in Perrysburg and CR 99 in Hancock County.  Through December, southbound I-75 is reduced to two lanes from US 20 to I-475 in Perrysburg. Through December, 11-foot lane width restrictions are in place on I-75 between US 20 in Perrysburg and CR 99 in Hancock County.

Southbound I-75, between Portage Road and Oil Center Road, is now open to three lanes.   Additional traffic pattern changes will be announced.

Ramp Restrictions:

·         Through November, the ramp from southbound I-75 to SR 582 is closed for pavement widening.  Detour: SR 64/SR 105 (Exit 181); northbound I-75.

·         Through November, the ramp from SR 582 to southbound I-75 is closed for pavement widening.  Detour: northbound I-75; US 20 (Exit 193); southbound I-75.

State Routes:
Through November, SR 582 over I-75, will be reduced to one lane for pavement and bridge work.  Traffic will be maintained by traffic signal.

Local Routes:
Through December, Township Road 101 in Hancock County, between CR 220 and TR 142, is closed for bridge work over I-75.

Project complete: October 2017.  All work is weather permitting.

2. Interstate 75: Widening *MAJOR SOUTHBOUND I-75 WEEKEND CLOSURE*
Lucas County (485-14, 536-14):
  Through September 2018, overnight, 7pm through 6am, single lane restrictions are possible on I-75, from I-475 in Toledo to I-280 for bridge work.

Through Friday, October 28, nightly from 10pm until 6am, southbound I-75, between Phillips Avenue and Berdan Avenue may be reduced to one lane for bridge work.  Additionally at this time, the ramp from Phillips Avenue to southbound I-75 may be closed. Detour: Manhattan Boulevard; Stickney Avenue; southbound I-75.

Effective Friday, October 28 at 9pm, through Monday, October 31 at 6am, southbound I-75, between Berdan Avenue and Delaware Avenue, will be closed for traffic pattern change.  Detour: southbound I-280 (Exit 208); SR 795 (Exit 2).

The ramp from southbound I-75 to westbound I-475 will remain open.  Expect delays.

The following ramps are closed:

  • Effective Friday, October 28 at 9pm, through July 2018, the ramp from Phillips Avenue to southbound I-75 will be closed.  Detour: northbound I-75; Stickney Avenue (Exit 207); North Expressway Drive; southbound I-75.
  • The ramp from northbound I-75 to Berdan Avenue (Exit 205B) is permanently closed.  Detour: Phillips Avenue (Exit 206); Detroit Avenue; Berdan Avenue. 
  • Through July 2018, the ramp from Jeep/Willys Parkway to southbound I-75.  Detour: Berdan Avenue.
  • Through July 2018, the ramp from Jeep/Willys Parkway to northbound I-75.  Detour: Berdan Avenue; Detroit Avenue; Phillips Avenue.
  • Through July 2018, the ramp from southbound I-75 to Jeep/Willys Parkway (Exit 205A).  Detour: Detroit Avenue (Exit 203B).

The following ramps are open:

  • The ramp from northbound I-75 to Jeep Parkway (Exit 205A) is now open.
  • The ramp from northbound I-75 to Phillips Avenue (Exit 206) is now open.

Local Streets:

Jeep Parkway from Central Avenue to Berdan Avenue is now open.

Through November, South Expressway Drive is restricted to a single lane between Stickney Avenue and Lagrange Street.

Through November, Elm Street and Wersell Avenue at South Expressway Drive, is closed.

Through May 2017, the Polish Village Overpass is closed for bridge work.  Detour: North Expressway Drive; Stickney Avenue; South Expressway Drive.

Through October 2017, expect lane restrictions on Phillips Avenue at I-75 for bridge work.

Through July 2018, lane restrictions are possible on Detroit Avenue at I-75 for bridge work.

Through July 2018, expect lane restrictions on Berdan Avenue at I-75 for bridge work.

Through July 2018, Willys Parkway from Pioneer Lane to Jeep Parkway is closed.

Project complete: September 2018.  All work is weather permitting.

3. Interstate 75: Pavement Rehabilitation *UPDATE*
Lucas County (268-14): 
Through Friday, October 28 at 6am, southbound I-75, from the I-75/475 split in Toledo to the Anthony Wayne Trail, is reduced to two lanes.

Effective tonight at 9pm, through Friday, October 28 at 6am, single lane restrictions are possible on southbound I-75, between I-475 and the Anthony Wayne Trail, for traffic pattern change.  Additionally at this time, the following ramps may be closed:

·         Eastbound I-475 to southbound I-75.  Detour: northbound I-75; Stickney Avenue (Exit 207); southbound I-75.

·         Southbound I-75 to Washington Street (Exit 202A).  Detour: Collingwood Boulevard (Exit 202B); Dorr Street.

·         Lawrence Street to southbound I-75.  Detour: Monroe Street; Michigan Street.

Effective Friday, October 28 at 6am, all lanes of southbound I-75, between the I-75/475 interchange and the Anthony Wayne Trail, will be open.

Ramps restrictions and closures:

·         Through Friday, November 4, the ramp from D­etroit Avenue to southbound I-75 is closed.  Detour: Monroe Street; Michigan Avenue; SR 25.

·         Through September 2018, the interchange ramp from eastbound I-475 to southbound I-75 is reduced to one lane.

Project complete: October.  All work is weather permitting.

4. Interstate 75/280: Rerouting

Lucas County (536-14):  Through December, northbound I-75 traffic is rerouted to southbound I-280 for bridge replacement.  Two lanes of traffic will be maintained.  Reroute: southbound I-280; Central Avenue; northbound I-280.  Through December, Central Avenue, between Buckeye Street and Galena Street, is closed.  Detour: Lagrange Street; Greenbelt Parkway; Galena Street.  Pedestrian access will be maintained.

5. Interstate 75: Rest Area Closure

Wood County (170-14)Through December, the northbound I-75 rest area is closed for renovations.  Through June 2017, the southbound I-75 rest area is closed for renovations, pavement repair.  Project complete: June 2017.  All work is weather permitting.

6. Interstate 280: Bridge Repair

Lucas County (1075-16):  Through November, southbound I-280, between Greenbelt Parkway (Exit 11) and Starr Avenue (Exit 8), may be reduced to two lanes for bridge repair.  Through November, the ramp from Greenbelt Parkway to southbound I-280 is closed for bridge work.  Detour: northbound I-280; Manhattan Boulevard (Exit 12).  Project complete: January 2017.  All work is weather permitting.

7. Interstate 475: ProMedica Parkway Ramp
Lucas County:
  Through Friday, October 28 at 6am, the ramp from ProMedica Parkway to eastbound I-475 is closed for traffic control.  Detour: westbound I-475; Douglas Road.

 

Effective Friday, October 28 at 6am, the ramp from ProMedica Parkway to eastbound I-475 will be open to access southbound I-75 only.

Through September 2018, the ramp from ProMedica Parkway to eastbound I-475 to access northbound I-75 is closed.  Detour: southbound I-75; Detroit Avenue (Exit 203B); northbound I-75.

All work is weather permitting.

 

8. Interstate 475: Resurfacing and Bridge Project

Lucas County (58-16):  Through October, overnight from 8pm until 6am, single lane restrictions are possible on I-475, between the US 23 interchange and Douglas Road, for resurfacing.  Additional restrictions may be announced.  Project complete: October.  All work is weather permitting.

9. Interstate 475: Bridge Widening *PROJECT COMPLETE*

Lucas County (235-14):  Overnight lane restrictions on I-475, between Angola Road and Salisbury Road/Dussel Drive for pavement work are lifted.  The bridge widening project is complete.

10. Interstate Maintenance Work

Lucas and Wood Counties:  Through Friday, November 11, daily from 9am until 3pm, lane restrictions are possible on the collector ramp from southbound I-75 to the Ohio Turnpike and SR 795 (Exit 195) for pavement repair.  The ramps will remain open.

Through December, intermittent overnight lane restrictions are possible on I-75, I-280 and I-475 in Lucas and Wood counties for maintenance work.  Project complete: December.  All work is weather permitting.

11. U.S. Route 20: Central Avenue Interchange Project *UPDATE*
Lucas County (210-15):
 Through November, Central Avenue, between McCord Road and Van Fleet Parkway, is reduced to one lane. 11-foot lane width restrictions are in place within the work zone.

Through Wednesday, November 2, the following ramps are closed for ramp construction:

·         The ramp from northbound I-475/US 23 to Central Avenue (Exit 13).  Detour: Eastbound I-475; Secor Road (Exit 17); westbound I-475; southbound I-475; Central Avenue (Exit 13).

·         The ramp from Central Avenue to southbound I-475/US 23.  Detour: Northbound I-475/US 23; eastbound I-475; Secor Road (Exit 17); westbound I-475; southbound I-475.

Following this work, the Single Point Urban Interchange will be in effect.

Traffic is on the following new ramps.  These ramps will remain open to traffic:

·         The ramp from Central Avenue to northbound I-475/US 23.

·         The ramp from southbound I-475/US 23 to Central Avenue.

Through November, southbound US 23 traffic is reduced to one lane from the I-475/US 23 split in Sylvania to Central Avenue.  Through September 2017, overnight from 9pm until 6am, lane restrictions are possible on I-475/US 23 between Dorr Street and N. Holland Sylvania Road.  11-foot lane width restrictions are in place within the work zone.  Project complete: September 2017.  All work is weather permitting.

12. U.S. Route 20: Resurfacing and Turn Lanes
Lucas County (366-16): 
Through November, lane restrictions are possible on Central Avenue/US 20, between Lucas/Fulton County line and King Road, for resurfacing.  Project complete: November.  All work is weather permitting.

13. U.S. Route 20: Traffic Signal Upgrades *UPDATE*

Lucas County (301-16):  Through November, daytime intermittent lane restrictions are possible at the intersection of Central Avenue/US 20 and Meijer Drive for finish work.  Project complete: November.  All work is weather permitting.

14. U.S. Route 24: Pavement Repair *NEW WORK*

Lucas County:  Effective Monday, November 7, through Tuesday, November 15, lane restrictions are possible on US 24, between the Henry/Lucas County line and Fallen Timbers Lane (Exit 67), for pavement repair work.  All work is weather permitting.

15. State Route 2: Resurfacing *UPDATE*

Lucas County (246-16):  Through November, lane restrictions are possible on Airport Highway/SR 2, between Garden Road and the Lucas/Fulton County line, for finish work.  Project complete: November.  All work is weather permitting.

16. State Route 2: Intersection Upgrades
Lucas County (142-15): 
Through November, nightly from 7pm until 6am, overnight lane restrictions are possible on Airport Highway/SR 2 at Holland Sylvania Road, for intersection upgrades.  Through November, nightly from 7pm until 6am, overnight lane restrictions are possible on SR 2/Airport Highway at Reynolds Road, for intersection upgrades.  Additional restrictions will be announced.  Project Complete: December.  All work is weather permitting.

 

17. State Route 2: Anthony Wayne Bridge Painting Project
Lucas County (220-16): 
Through October, Yondota Street, between Stratton Street and Greenwood Avenue, is closed for sand blasting and bridge painting.  Detour: Nevada Street; Oak Street; Greenwood Avenue.  Lane restrictions on the Anthony Wayne Bridge and local road closures will be announced.  Project complete: November 2017.  All work is weather permitting.

18. State Route 2: Resurfacing *UPDATE*
Lucas County (8028-16): 
Through November, lane restrictions are possible on SR 2, between North Curtice Road and the Lucas/Ottawa county line.  Traffic will be maintained by flaggers.  Additional restrictions will be announced in Spring 2017.  Project complete: June 2017.  All work is weather permitting.

 

19. State Route 51: Bridge Repair *UPDATE*

Lucas County (60-16):  Through November, intermittent lane restrictions are possible on Monroe Street/SR 51, between Parkview Avenue and Inwood Drive in Toledo, for finish work.  Project complete: November.  All work is weather permitting.

20. Bancroft Street: Bridge Repair *OVERNIGHT RAMP CLOSURE*

Lucas County (59-16):  Through November, overnight, 7pm through 6am, single lane restrictions are possible on I-75, from the I-75/475 split in Toledo to the Anthony Wayne Trail.

Effective tonight at 9pm, through Friday, October 28 at 6am, the ramp from northbound I-75 to Bancroft Street (Exit 203A) will be closed for bridge work.  Detour: Detroit Avenue (Exit 203B); Monroe Street.

 

Project complete: November.  All work is weather permitting.

21. Delaware Avenue: Bridge Rehabilitation

Lucas County (25-16):  Delaware Avenue, between Ayers Avenue and Kress Street in Toledo, is open.  Finish work will be completed from the sidewalk.  Project complete: November.  All work is weather permitting.

22. McCord Road: Underpass Construction *UPDATE*
Lucas County (236-14):  Through Friday, November 4, McCord Road between North Mall Drive/Hall Road and Spectrum Drive is closed to vehicular and pedestrian traffic. Detour: Holland Park Boulevard; North Mall Drive.  Project complete: November.  All work is weather permitting.

23. Oakwood Avenue: Bridge Work

Lucas County (268-14):  Through November, the intersection of Oakwood Avenue and Art Museum Drive, will be closed for pavement work.  Seek alternate route.  Through November, Oakwood Avenue, between Wells Street and Grove Place, is closed for bridge work.  Seek alternate route.  Project complete: November.  All work is weather permitting.

24. Rushland Avenue: Bridge Redecking
Lucas County (289-16):
  Through November, nightly from 7pm through 6am, lane restrictions are possible on I-475, at Rushland Avenue for bridge work.  Through November, Rushland Avenue between Groveland Road and Langenderfer Drive is closed for bridge deck replacement.  Detour: Langenderfer Drive; Bowen Road; Groveland Road.  Project complete: June 2018.  All work is weather permitting. 

25. Woodley Road: Bridge Repair Project *UPDATE*
Lucas County (24-16):  Through Monday, October 31, Woodley Road, between Ellenridge Lane and Professional Drive, is closed for corrective and finish work.  Detour: Central Avenue; Talmadge Road; Sylvania Avenue.  Through November, shoulder restrictions are possible on I-475 at Woodley Road for bridge work.  Through November, overnight, from 8pm until 6am, single lane restrictions are possible on I-475, between Talmadge Road and Secor Road, for bridge repair.  Project complete: November.  All work is weather permitting. 

26. U.S. Route 6: Pavement Reconstruction and Bridge Work *UPDATE*
Wood County (170-14):
  Through November, US 6, between SR 25 and Dunbridge Road, is reduced to one lane in each direction.  Lane widths are restricted to 11ft in this work zone.  Work complete: October.  All work is weather permitting.

 

27. U.S. Route 6: Resurfacing and Culvert Replacements
Wood County (373-16): 
Through October, lane restrictions are possible on US 6, between the Wood/Henry County line and SR 235, for paving. Traffic will be maintained by flaggers.  Project complete: October.  All work is weather permitting.

28. U.S. Route 20: Resurfacing

Wood County (256-16):  The weather sensor installation on US 20, between Lime City Road and SR 420, is complete.  Restrictions and closures will be announced in 2017.  Project complete: June 2017.  All work is weather permitting.

29. State Route 25: Diverging Diamond Interchange

Wood County (8029-16):  Through October 2017, overnight from 7pm until 6am, single lane restrictions are possible on I-475, between the I-75/475 interchange and Fort Meigs Road.  Additionally, overnight from 9pm until 6am, lane restrictions are possible on SR 25, between Levis Commons Boulevard and Eckel Junction Road.  Project complete: October 2017.  All work is weather permitting.

 

30. State Route 64/105: Material Testing *LANE RESTRICTIONS TUESDAY*

Wood County:  Effective Tuesday, November 1, from 10am until noon, eastbound SR 64/105 (Wooster Street) over I-75 will be reduced to one lane for material testing. All work is weather permitting.

31. State Route 105: Resurfacing *PROJECT COMPLETE*

Wood County (257-16):  The intermittent lane restrictions on SR 105, between Dunbridge Road and SR 199, are lifted.  The resurfacing project is complete.

32. State Route 199: Roundabout Construction
Wood County (4004-16):
 Additional restrictions for the roundabout at SR 199 and Roachton Road may be announced for finish work.  Project complete: November.  All work is weather permitting.

33. State Route 235: Railroad Repair *NEW WORK*

Wood County:  Effective Monday, November 7, through Monday, November 21, SR 235, between Railroad Street and Needles Road in Hoytville, will be closed for railroad repair.  Detour: SR 18; SR 65; Protec Parkway; SR 613.  All work is weather permitting.

 

34. State Route 795: Traffic Signal Upgrades

Wood County (301-16):  Through November, daytime intermittent lane restrictions are possible on SR 795 at Glenwood Road, for traffic signal upgrades.  Project complete: November.  All work is weather permitting.

35. Cherry Street: Bridge Replacement *ROAD OPEN*

Wood County (3053-15):  Cherry Street, between Lennex Lane and Main Street in Millbury, now open.  Through November, intermittent lane restrictions are possible on Cherry Street, between Lennex Lane and Main Street in Millbury, for finish work.  Traffic will be maintained by flaggers.  Detour: Bradner Road; SR 795; Main Street.  Project complete: November. All work is weather permitting.

36. Dunbridge Road: Bridge Replacement

Wood County (3053-15):  Through November, Dunbridge Road, between Nelson Road and Simonds Road, is closed for bridge replacement.  Detour: Poe Road; Carter Road; Sugar Ridge Road.  Project complete: November.  All work is weather permitting.

37. Kramer Road: Material Testing *WORK COMPLETE*

Wood County:  Kramer Road over I-75 is now open.  The material testing is complete.

38. Lemoyne Road: Bridge Replacement

Wood County (3053-15):  Through November, Lemoyne Road, between Gilbert Road and Garling Road, is closed for bridge replacement.  Detour: SR 582; Pemberville Road; US 20; Lemoyne Access Road.  Project complete: November.  All work is weather permitting.

39. Lime City Road: Bridge Replacement
Wood County (3053-15): 
Through November, intermittent lane restrictions are possible on Lime City Road between Marilyn Drive and Grassy Lane for finish work. Traffic will be maintained by flaggers. Project Complete: November.  All work is weather permitting.

 

Ottawa/Sandusky/Seneca Counties

 

40. State Route 2: Lightner Road Bridge Widening *PROJECT COMPLETE*

Ottawa County (232-15):  The intermittent lane restrictions on SR 2, between SR 53/SE Catawba Road and SR 269, and on Lightner Road, between Kirk Road and East State Road, are lifted. The bridge widening project is complete.

41. State Route 2: Bridge Repair

Ottawa County:  Through Friday, October 28, daily from 6:30am until 3pm, the ramp from eastbound SR 2 to northbound SR 53 (Exit 124) may be closed for bridge repair.  Detour: northbound SR 269 (Exit 125A); SR 163.  All work is weather permitting.

42. State Route 51: Pavement Repair *UPDATE*

Ottawa and Wood Counties (194-16):  Through November, lane restrictions are possible on SR 51, between SR 163 and SR 579, for pavement repair.  Traffic will be maintained by flaggers.  Project complete: November.  All work is weather permitting.

43. State Route 163: Bridge Rehabilitation Project

Ottawa County (304-15):  Through November, lane restrictions are possible on the SR 163 lift bridge in Port Clinton for bridge work.  The closure of the SR 163 lift bridge in Port Clinton has been postponed to October 2017.  Project complete: June 2018.  All work is weather permitting.

44. State Route 19: Railroad Repair *WORK COMPLETE*

Sandusky County:  SR 19, between CR 109 and CR 119, is now open.  The railroad repair work is complete.

45. State Route 53: Traffic Signal Upgrades *UPDATE*

Sandusky County (301-16):  Through November, shoulder restrictions are possible on SR 53, between US 20 and Sean Street, for finish work. Additional restrictions may be announced.  Project Complete: November.  All work is weather permitting.

46. State Route 18: Bridge Replacement
Seneca County (406-16): 
Through November, SR 18, between CR 32 and TR 178 over Royer Ditch, is closed for bridge replacement.  Detour: SR 162; SR 4; SR 269; US 20.  Project complete: December.  All work is weather permitting.

 

47. State Route 162: Resurfacing *PROJECT COMPLETE*

Seneca County (257-16):  Intermittent lane restrictions on SR 162, between SR 19 and TR 197, are lifted.  The resurfacing project is complete.

Williams/Fulton/Henry Counties

 

48. U.S. Route 20A: Railroad repair *NEW WORK*

Williams County:  Effective Monday, November 7, through Friday, November 11, US 20A, between CR M and SR 107, will be closed for railroad repair.  Detour: US 20; SR 576; SR 107.  All work is weather permitting.

 

49. State Route 2: Culvert Replacement *UPDATE*

Williams County (506-15):  Through November, lane restrictions are possible on SR 2, between CR 19 and CR 20, for finish work.  Project complete: October.  All work is weather permitting.

 

50. State Route 15: Pavement Repair *UPDATE*
Williams County (489-15):
  Through November, lane restrictions are possible on SR 15, between US 127 and CR O, for finish work. Project complete: November.  All work is weather permitting.

51. State Route 576: Culvert Replacement *UPDATE*
Williams County (506-15):  Through November, intermittent lane restrictions are possible on SR 576, between CR M and CR N30, for finish work.  Project complete: November.  All work is weather permitting.

52. U.S. Route 20A: Resurfacing and Signal Upgrades *UPDATE*

Fulton County (8016-16):  Through November, lane restrictions are possible on Airport Highway/US 20A, between the Lucas/Fulton County line and CR 3, for resurfacing and signal upgrades.  Project complete: January 2017.  All work is weather permitting.

53. State Route 64: Bridge Repair *UPDATE*

Fulton County (8016-16):  Through November, SR 64/Main Street, between South Street and Bassett Avenue in Swanton, is closed for bridge repair.  Detour: US 20A; Hallett Avenue; Church Street.  Local access will be maintained.  Project complete: January 2017.  All work is weather permitting.

54. State Route 109: Damascus Bridge: Bridge Replacement

Henry County (1-15):  Through May 2017, stop signs will be at the intersection of CR 424 at SR 109 for traffic control.  Through October 2017, motorists should watch for additional truck traffic near SR 109 at the Damascus bridge for bridge work.  Work impacting traffic will be announced.  Project complete: October 2017.  All work is weather permitting.

55. County Road 1: Bridge Replacement *PROJECT COMPLETE*
Henry County (3004-16):  Lane restrictions on Henry County Road 1, between CR D/Oil Center Road and CR E/Hammansburg Road, are lifted.  The bridge replacement project is complete.

District Wide 

                                                                                                                                                      

56. Various Routes: Guardrail, Striping & Electrical Maintenance

District Wide (1053-15 & 1059-15 & 1044-15):  Through December, intermittent lane restrictions are possible district wide for guardrail, striping and electrical maintenance.  Project complete: December.  All work is weather permitting.

57. Various Routes: Mowing

District Wide (1028-16):  Through October, intermittent lane and shoulder restrictions are possible district wide for mowing.  Project complete: December.  All work is weather permitting.

58. Various Routes: Raised Pavement Markers

District Wide (1055-15):  Through October, intermittent lane restrictions are possible district wide for raised pavement marker work.  Traffic will be maintained by flaggers. Project complete: October.  All work is weather permitting.

Leave a Reply

Your email address will not be published. Required fields are marked *

NBX powered by PANDA Technologies
February 2017
NBLS Website