Lucas Co. Construction Update – 8/11

Lucas County Weekly Construction Update

Updates are highlighted in bold and underlined


75 

Interstate 75

I-75 Widening and Bridge Work 

Project 485-14/PID 77254

Through August

  • Lane restrictions possible between I-475 and Lagrange Street
  • Lane restrictions possible on northbound and southbound I-75 between Stickney Ave. and Delaware Ave. for paving
  • Ramp closures possible to/from I-75 to/from exits between Stickney Ave. and Delaware Ave. for paving
  • Pioneer Ln. between SR 120/Central Ave. and Jeep Pkwy. interchange closed
    Detour: Willys Pkwy.; Berdan Ave.; Jeep Pkwy.; Central Ave.

75 

Interstate 75

I-75 Widening and Bridge Work

Projects 277-18/PID 93594 and 108-19/PID 93592

Through Fall 2023

Lane restrictions possible on I-75 between Buck Rd. and Monroe St. for major reconstruction

Nightly ramp and lane closures possible on I-75 between Monroe St. and Buck Rd.

  • Ramp now open from South Ave. to southbound I-75
    *Ramp will close in November through December 2020

 

Through mid-September

  • Ramp closed from northbound I-75 to Wales Rd.
    Detour: northbound I-75; Miami St.; southbound I-75
  • Ramp closed from westbound Miami St. to northbound I-75
    Detour: southbound I-75; Wales Rd.; northbound I-75
    *New westbound Miami St. to northbound I-75 configuration; use eastbound ramp to northbound I-75*

 

Through November

  • Dorr St. bridge closed between Division St. and Washington St.
    Detour: 17th St.; Monroe St.; Collingwood Blvd.; Dorr St.
  • Ramp closed from northbound I-75 to Collingwood Blvd.
    Detour: northbound I-75/SR 25/Downtown; Erie St.
  • Newton St. between Erie St. and Broadway St. two-way traffic, permanently
  • Logan St. between Oliver St. and St. Clair St. closed
  • Logan St. between St. Clair St. and Erie St. closed, permanently
  • Erie St. closed between Collingwood Blvd. and Sunrise ramp/temporary road

 

Through January 2020

  • Ramp closed from Buck Rd. to northbound I-75
    Detour: southbound I-75; SR 795; northbound I-75

 

Through Summer 2020

  • Ramp closed from Collingwood Blvd. to southbound I-75
    Detour: Collingwood Blvd.; Erie St.; Washington St.; SR 25; Southbound I-75
  • Emerald Ave. and Segur Ave. under I-75 closed. Seek alternate route.

 

Through December 2020

  • Ramp closed from South Ave. to southbound I-75
    Detour: northbound I-75; Detroit Ave.; southbound I-75

 

Through Fall 2023

  • I-75 reduced to two 11-foot lanes in each direction between Buck Rd. and Monroe St.

75 

Interstate 75

Indiana Avenue Bridge Replacement

Project 8010-17/PID 86926

Through August

Indiana Ave. over I-75 now open to through traffic

Lane restrictions possible for finish work

Pedestrian access maintained on Indiana Ave.


75 

Interstate 75

Parapet Sealing

Project 8003-19/PID 104921

Through September 2019

Shoulder restrictions possible between Phillips Ave. and Jeep Pkwy. in both directions


I 475 

Interstate 475/Corey Road

Bridge Deck Replacement

Project 159-19/PID 102797

Through August

Corey Rd. now open over I-475

Lane restrictions possible for finish work


I 475 

Interstate 475

Interstate 475/US 24 Interchange Improvement

Project 93-19/PID 103739

Through October

Ramp from southbound I-475 to westbound US 24 (Exit 4B) will be closed for ramp realignment

Detour: Eastbound US 24 (Exit 4A); northbound I-475 (Exit 68B); westbound US 24 (Exit 4B)

Additional lane restrictions possible


US 24 

US Route 24

Concrete Repairs

US 24 between Henry Co. line and SR 64

*Work Complete*


state route 2 SR 2 

State Route 2/Anthony Wayne High Level Bridge

Bridge Dehumidification Project

Project 3001-18/PID 101556

Through June 2020

Lane restrictions possible between Broadway St. and Clark St.


state route 2 SR 2 

State Route 2

Traffic Signal Replacement

Project 33-19/PID 101148

Through December

Lane restrictions possible on SR 2/Airport Hwy. near Holloway Rd.


SR 25 

State Route 25/Anthony Wayne Trail

Bridge Replacement

Project 142-18/PID 85266

Through Summer 2020

Lane restrictions on SR 25/Anthony Wayne Trail between Western Ave. and Collingwood Blvd.

 

Through Spring 2020

  • Inbound SR 25 reduced to one, 11-foot lane
  • Outbound SR 25 remains two lanes
  • Emerald Ave. closed between Vinton St. and SR 25/Anthony Wayne Trail
  • City Park Ave. closed between Greene St. and SR 25/Anthony Wayne Trail

Seek alternate route

 

Additional lane restrictions may be announced


SR 64 

State Route 64

Waterville Bridge Replacement
Project 567-17/PID 92088

Through September 2020

Lane restrictions possible

 

One weekend closure in 2019 (dates TBA)

Memorial Park remains closed through October 2020


SR 184 

State Route 184

Traffic Signal Replacement

Project 33-19/PID 101148

Through December

Lane restrictions possible on SR 184/Alexis Rd. near Whiteford Rd.


SR 295 

State Route 295

Bridge Painting

Project 553-18/PID 102923

Through September

Lane restrictions possible on SR 295 in Grand Rapids for bridge painting preparation work


Various Routes District-wide

Guardrail & Electrical Maintenance

Projects 1052-17, 1050-18 & 1059-17/PIDs 103414, 103373, 106115

Through December

Lane restrictions are possible district-wide


**All work is weather permitting.**

 

For more information contact: 

The District Two Public Information Office at

(419) 373-4428
or email [email protected]


OHGO.com logo

Know Before You Go!

For more detailed traffic information, and to get personalized traffic alerts for your commute, download the OHGO app or visit OHGO.com.


The environmental review, consultation and other actions required by applicable Federal environmental laws for these projects are being, or have been, carried out by ODOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 11, 2015, and executed by FHWA and ODOT.

Resize
Size Update
Sept. 2023
Sept. 2023
Logo & Info Aug 2023
June 2023 Left Rail
Temporary
Breast Cancer Treatment Rail Ad
Fiber Locator
OB You’re Expecting
Logo
Briar Hill Health Update
Ol’ Jenny

Leave a Reply

Your email address will not be published. Required fields are marked *

NBX powered by PANDA Technologies
NBLS Website