North Baltimore, Ohio

November 28, 2023 8:37 am

NEW # > 419-619-7318

Leave a message with sports scores or news 24/7/365

Ol’ Jenny
Resize
Sept. 2023
Temporary
Size Update
Logo
Sept. 2023
June 2023 Left Rail
Fiber Locator
Logo & Info Aug 2023
OB You’re Expecting

Lucas County Weekly Construction Update – Dec. 9

Lucas County Weekly Construction Update


75 

Interstate 75

*UPDATE*

I-75 Widening and Bridge Work 

Project 485-14/PID 77254

Through Spring 2020

  • Lane restrictions possible between I-475 and Lagrange St.
  • Lane restrictions possible on northbound and southbound I-75 between Stickney Ave. and Delaware Ave.
  • Ramp closures possible to/from I-75 to/from exits between Stickney Ave. and Delaware Ave.

 

Sunday, December 8, 9pm-6am

  • Overnight lane restrictions possible on eastbound I-475
  • Ramp closed overnight from eastbound I-475 to northbound I-75
    Detour: Southbound I-75; Detroit Ave.; Northbound I-75

 

Monday, December 9, 10pm-6am

  • Overnight lane restrictions possible on eastbound I-475
  • Ramp closed overnight from eastbound I-475 to southbound I-75
    Detour: Northbound I-75; Phillips Ave.; Southbound I-75

75 

Interstate 75

*CLOSURES START MONDAY*

I-75 Widening and Bridge Work

Projects 277-18/PID 93594 and 108-19/PID 93592

Through Fall 2023

Lane restrictions on I-75 between Buck Rd. and Monroe St. for major reconstruction

Nightly ramp and lane closures possible on I-75 between Buck Rd. and Monroe St.

 

  • Dorr Street bridge now open between Division St. and Washington St.
  • Logan St. now open between Oliver St. and St. Clair St.
  • Erie St. now open between Collingwood Blvd. and Sunrise ramp/temporary road

 

Monday, December 9 through Friday, December 13, 9pm-6am

  • Overnight lane restrictions possible on I-75 near Dorr St.

 

Monday, December 9, 9pm-6am

  • Ramp closed from Washington St. to northbound I-75

 

Tuesday, December 10, 9pm-6am

  • Ramp closed from SR 25/AW Trail to northbound I-75

 

Thursday, December 12 and Friday, December 13, 9pm-6am

  • Ramp closed from southbound I-75 to Washington St. (Exit 202A)

 

Through January

  • Lane restrictions possible on Broadway St. between Newton St. and Segur Ave. for overhead work

 

Through Summer 2020

  • Ramp closed from Collingwood Blvd. to southbound I-75 Detour: Collingwood Blvd.; Erie St.; Washington St.; SR 25; southbound I-75
  • Emerald Ave. and Segur Ave. under I-75 closed. Seek alternate route.

 

Through December 2020

  • Ramp closed from South Ave. to southbound I-75 Detour: Northbound I-75; Detroit Ave. (Exit 203B); Southbound I-75

 

Through Fall 2023

  • I-75 reduced to two 11-foot lanes in each direction between Monroe St. and Buck Rd.

I 475 

Interstate 475

Widening and Interchange Construction

Project 470-19/PID 88084

Through Summer 2021

Overnight lane restrictions possible on I-475 between Airport Hwy. and Bancroft St.

 

Through October 2020

  • Westbound Dorr St. closed between Holland-Sylvania Rd. and McCord Rd.
    Detour: Northbound Holland-Sylvania Rd.; Westbound Bancroft St.; South on McCord Rd.

 

Additional restrictions will be announced


US 23 

US Route 23

*CLOSURE SUNDAY*

Pavement Grinding

Sunday, December 8, 6am-12pm (noon)

Ramp closed from northbound US 23 to Monroe St. (Exit 234)

Seek alternate route


state route 2 SR 2 

State Route 2/Anthony Wayne High Level Bridge

Bridge Dehumidification Project

Project 3001-18/PID 101556

Through June 2020

Lane restrictions possible between Broadway St. and Clark St.


state route 2 SR 2 

State Route 2

Traffic Signal Replacement

Project 33-19/PID 101148

Through December

Lane restrictions possible on SR 2/Airport Hwy. near Holloway Rd.


SR 25 

State Route 25/Anthony Wayne Trail

Bridge Replacement

Project 142-18/PID 85266

Through Summer 2020

Lane restrictions on SR 25/Anthony Wayne Trail between Western Ave. and Collingwood Blvd.

 

Through Spring 2020

  • Inbound SR 25 reduced to one, 11-foot lane
  • Outbound SR 25 remains two lanes
  • Emerald Ave. closed between Vinton St. and SR 25/Anthony Wayne Trail
  • City Park Ave. closed between Greene St. and SR 25/Anthony Wayne Trail
    Seek alternate route

Additional lane restrictions may be announced


SR 64 

State Route 64

Waterville Bridge Replacement
Project 567-17/PID 92088

Through September 2020

Lane restrictions possible

One weekend closure in 2020 (dates TBA)

Memorial Park remains closed through October 2020


SR 184 

State Route 184

Traffic Signal Replacement

Project 33-19/PID 101148

Through December

Lane restrictions possible on SR 184/Alexis Rd. near Whiteford Rd.


SR 295 

State Route 295

Railroad Repairs

Through mid-December

SR 295 closed between Soul Rd. and Cardinal Ln. for railroad repairs

Detour: SR 2; Eber Rd.; Old State Line Rd.

Closure maintained by railroad


Various Routes District-wide

Guardrail & Electrical Maintenance

Projects 1052-17, 1050-18 & 1059-17/PIDs 103414, 103373, 106115

Through December

Lane restrictions are possible district-wide


**All work is weather permitting.**

Resize
Size Update
Sept. 2023
Sept. 2023
Logo & Info Aug 2023
June 2023 Left Rail
Temporary
Breast Cancer Treatment Rail Ad
Fiber Locator
OB You’re Expecting
Logo
Briar Hill Health Update
Ol’ Jenny

Leave a Reply

Your email address will not be published. Required fields are marked *

NBX powered by PANDA Technologies
NBLS Website