North Baltimore, Ohio

February 18, 2025 2:04 am

The District Update – Water Shed
Need A Chiropractor
BVHS Wellness Park TOP
Resize
Size Update
OB You’re Expecting
Sept. 2023
Logo & Info Aug 2023
Sept. 2023
Logo
Temporary
Amplex Fiber June 2024
June 2023 Left Rail

ODOT D-1 Constuction Update – Oct. 2

ODOT District Two Weekly Construction Update

Updates are highlighted in bold and underlined.

Lucas/Wood Counties

1. Interstate 75: Widening *UPDATE*
Wood & Hancock Counties (170-14, 199-14, 237-14 & 3000-14):

Interstate Restrictions:

Effective Friday, October 9 at 8pm, through Saturday, October 10 at 6am, the ramp from northbound I-75 to westbound I-475 may be closed for barrier wall relocation.  Detour: SR 795 (Exit 195); I-75.  Additionally, the ramp from eastbound I-475 to northbound I-75 may be closed for barrier wall relocation.  Detour: Southbound I-75; SR 582 (Exit 187).  Motorists are advised of changing traffic patterns in this work zone.

Through October, northbound I-75 in Perrysburg, between the ramp from northbound I-75 to westbound I-475 (Exit 192) and the ramp from eastbound I-475 to northbound I-75, is reduced to one lane for pavement work.  Motorists should be aware of traffic pattern changes in this area.

Through November, overnight, from 7pm until 6am, single lane restrictions are possible on I-75 between the I-75/I-475 interchange in Perrysburg and CR 99 in Hancock County.  Through 2016, southbound I-75 is reduced to two lanes from US 20 to I-475 in Perrysburg. Through 2016, 11-foot lane width restrictions are in place on I-75 between US 20 in Perrysburg and CR 99 in Hancock County.

Ramp Restrictions:

·         Through December, the ramp from southbound I-75 to westbound I-475 is reduced to one lane. 

·         Through July 2016, 11-foot lane width restrictions are in place on the ramps from northbound and southbound I-75 to Cygnet Road (Exit 171) and from Cygnet Road to northbound and southbound I-75.

Local Routes:

Through November, Jerry City Road at I-75 is closed for bridge work.  Detour: SR 25; SR 281; Solether Road.

Through December, Township Road 101 in Hancock County, between CR 220 and TR 142, is closed for bridge work over I-75.  Project complete: October 2017.  All work is weather permitting.

2. Interstate 75: Widening
Lucas County (485-14, 536-14):
  Through July 2018, overnight, 7pm through 6am, single lane restrictions are possible on I-75, from I-475 in Toledo to I-280 for bridge work.  Through fall 2016, one lane of I-75 traffic is maintained in the current northbound lane and one lane of traffic is relocated to southbound I-75 and separated by barrier wall.

The following ramps are closed:

·         Through June 2016, the ramp from Phillips Avenue to northbound I-75.  Detour: Manhattan Boulevard; Lagrange Street; South Expressway Drive.

·         Through July 2016, the ramp from southbound I-75 to Phillips Avenue (Exit 206).  Detour: North Expressway Drive (Exit 207); Stickney Avenue; South Expressway Drive.

·         Through August 2016, the ramp from northbound I-75 to Jeep Parkway (Exit 205A).  Detour: Berdan Avenue (Exit 205B); Detroit Avenue.

·         Through October 2016, the ramp from northbound I-75 to Phillips Avenue (Exit 206).  Detour: south Expressway Drive (Exit 207); Stickney Avenue; North Expressway Drive.

·         Through July 2018, the ramp from Jeep Parkway to southbound I-75.  Detour: Berdan Avenue.

·         Through July 2018, the ramp from Willys Parkway to northbound I-75.  Detour: Berdan Avenue; Detroit Avenue; Phillips Avenue.

·         Through July 2018, the ramp from southbound I-75 to Willys Parkway (Exit 205A).  Detour: Detroit Avenue (Exit 203B).

Local Streets:

Through October, South Expressway Drive is restricted to a single lane between Stickney Avenue and Lagrange Street.

The drainage installation work on Phillips Avenue, between I-75 and Manhattan Boulevard, has been postponed until further notice.  Through November, expect lane restrictions on Phillips Avenue at I-75, Lagrange Street at I-75, Berdan Avenue at I-75, Detroit Avenue at I-75, and Stickney Avenue at I-75 for bridge work.  

Through August 2016, Jeep Parkway from Central Avenue to Berdan Avenue is closed.  Central Avenue; Detroit Avenue; Berdan Avenue.

Through October 2016, the ramp from northbound I-75 to Berdan Avenue is restricted to right turn only movements.  Suggested alternate route: Berdan Avenue; Detroit Avenue; Phillips Avenue; Haverhill Drive.

Through May 2017, the Polish Village Overpass is closed for bridge work.  Detour: North Expressway Drive; Stickney Avenue; South Expressway Drive.

Through July 2018, Willys Parkway from Pioneer Lane to Jeep Parkway is closed.

Project complete: September 2018.  All work is weather permitting.

3. Interstate 75: Pavement Rehabilitation
Lucas County (268-14):
Through August 2016, I-75, from the I-75/475 split in Toledo to the Anthony Wayne Trail, is reduced to two lanes. Overnight, 10pm through 6am, single lane restrictions are possible in this work zone. 

Ramp closures:

•      Through October, the ramp from Lawrence Avenue to southbound I-75 will be closed for pavement installation.  Detour: Monroe Street; Michigan Street.

•      Through October, the ramp from northbound I-75 to Bancroft Street is closed.  Detour: Berdan Ave (Exit 205B); Detroit Avenue.

•      Through October, the ramp from Collingwood Boulevard to northbound I-75 is closed.  Detour:  Dorr Street; Washington Street; 14th Street.

•      Through November, the ramp from southbound I-75 to Collingwood Boulevard will be closed for pavement installation.  Detour: Washington Street (Exit 202A); Dorr Street.

Through August 2016, the following ramps are restricted or closed:

·         The interchange ramp from eastbound I-475 to southbound I-75 is reduced to one lane.

·         The interchange ramp from northbound I-75 to westbound I-475 is reduced to one lane.

·         The ramp from D­etroit Avenue to southbound I-75 is closed.  Detour: Monroe Street; Michigan Avenue; SR 25.

·         The ramp from Detroit Avenue to northbound I-75 is closed.  Detour: Monroe Street; 14th Street.

Through May 2016, Oakwood Avenue, between Wells Street and Grove Place, is closed for bridge work.  Seek alternate route.  Project complete: August 2016.  All work is weather permitting.

4. Interstate 75: Bridge Repair and Paving *NEW WORK*
Lucas County (375-15):
  Effective Saturday, October 3 at 7pm, through Sunday, October 4 at 6am, southbound I-75, between the Anthony Wayne Trail and South Avenue, may be reduced to one lane for bridge repair and paving. Additionally at this time, the ramp from Erie Street to southbound I-75 will be closed.  Detour: Anthony Wayne Trail; Western Avenue; Broadway Street/Summit Street; Washington Street; Michigan Street.  All work is weather permitting.

5. Interstate 75: Rest Area Closure

Wood County (170-14)Through July 2016, the northbound and southbound I-75 rest areas are closed as part of the I-75 widening project. Project complete: July 2016.  All work is weather permitting.

 

6. Interstate 475: ProMedica Parkway Ramp
Lucas County:
  Through 2016, the ramp from ProMedica Parkway to eastbound I-475 is closed for traffic control.  Detour: westbound I-475; Douglas Road.  All work is weather permitting.

7. Interstate 475/U.S. Route 23: Interchange Upgrade *UPDATE*
Lucas County (184-14 & 210-15):  
Effective Friday, October 2, from 2am until 6am, the ramp from southbound US 23 to eastbound I-475 will be closed for overhead sign installation.  Detour: southbound US 23; Airport Highway/SR 2 (Exit 8A); northbound I-475/US 23.

 

Through December, the ramp from southbound US 23 to Central Avenue is closed.  Detour: southbound I-475/US23; Airport Highway (Exit 8A).  Additionally at this time, southbound US 23 traffic is reduced to one lane from the I-475/US 23 split in Sylvania to Central Avenue.  The ramp from westbound I-475 to Central Avenue (Exit 13) is open.

Overnight lane restrictions are possible at the interchange of I-475/US 23 from Central Avenue to N. Holland Sylvania Road.  Through October, lane restrictions are possible on Blossman Road, between Moffat Road and Plainview Drive for bridge work.  Traffic will be maintained by flaggers.  Project complete: December.  All work is weather permitting.

8. Interstate 475: Bridge Widening
Lucas County (251-13 & 235-14):
  Through December, Angola Road at I-475 is closed for bridge replacement.  Detour: Holland Park Boulevard; North Mall Drive; McCord Road; Airport Highway; Holland Sylvania Road.  Through October, the ramp from westbound Airport Highway to northbound I-475 is closed.   Detour: southbound I-475; Salisbury Road/Dussel Drive (Exit 6).

Through May 2016, overnight from 8pm until 6am, lane restrictions are possible on I-475, between Angola Road and Salisbury Road/Dussel Drive.  11-foot lane width restrictions are in place on I-475, between Angola Road and Salisbury Road/Dussel Drive. Project complete: August 2016.  All work is weather permitting.  

9. Interstate 475: Noise Wall Installation

Lucas County (314-14):  Through October, intermittent shoulder and lane restrictions are possible on I-475, between Corey Road and Woodley Road, for finish work.  Project complete: October.  All work is weather permitting.

10. Interstate 475: Pavement Work

Wood County: Through October, overnight from 7pm to 6am, single lane restrictions are possible on I-475 in both directions between SR 25 and US 24 for pavement work.  All ramps will remain open.  All work is weather permitting.

11. Interstate Maintenance Work *UPDATE*

Lucas and Wood Counties:  Through Friday, October 2, from 9am until 2pm, lane restrictions are possible on northbound I-280, between Wheeling Street and Navarre Avenue/SR 2 (Exit 7) for drainage work.

 

Effective Saturday, October 3, from 12:00am to 6:30am, lane restrictions are possible on southbound I-475, between Bancroft Street and Hill Avenue, for pavement repair.  

 

Effective Monday, October 5, through Thursday, October 8, nightly from 9pm to 5am, lane restrictions are possible on I-75, between Anthony Wayne Trail (Exit 201B) and Dorr Street, for pavement repair.

Through Friday, October 9, nightly from 9pm to 6am, I-475, between the I-475/US 23 split and Monroe Street, may be reduced to one lane for pavement repair.  All ramps will remain open.  Through December, intermittent overnight lane restrictions are possible on I-75, I-280 and I-475 in Lucas and Wood counties for maintenance work.  Project complete: December.  All work is weather permitting.

12. U.S. Route 20: Central Avenue Interchange Project
Lucas County (210-15): 
Through September 2017, overnight from 9pm until 6am, lane restrictions are possible on I-475/US 23 between Dorr Street and the I-475/US 23 interchange.  11-foot lane width restrictions are in place within the work zone. Additional restrictions will be announced.  Project complete: September 2017.  All work is weather permitting. 

 

13. U.S. Route 20: Utility Work *UPDATE*

Lucas County: Through October, overnight from 9pm until 6am, lane restrictions are possible on Central Avenue, between I-475 and Central Park West, for gas line relocation.  For more information, contact Columbia Gas at 1-800-344-4077.  All work is weather permitting.

14. U.S. Route 20A: Eber Road Roundabout Project
Lucas County (184-15):
  Through November, US 20A at Eber Road will be closed for roundabout installation.  Detour: Airport Highway (SR 2); Crissey Road.  Project complete: November.  All work is weather permitting.

15. State Route 2: Pavement Coring *NEW WORK*

Lucas County:  Effective Sunday, October 4 at 9pm, through Monday, October 5 at 5am, single lane restrictions are possible on Airport Highway/SR 2, between Holloway Road and Holland-Sylvania Road, for pavement coring.  All work is weather permitting.

16. State Route 2: Anthony Wayne Bridge Project

Lucas County (58-13):  Through November, the Anthony Wayne Bridge is closed to vehicular and pedestrian traffic.  Detour: Oak Street; Fassett Street; Miami Street; I-75; Anthony Wayne Trail (Exit 201B); Monroe Street; Summit Street.  Through October, short-term intermittent, closures are possible on Yondota Street, Utah Street, Morris Street and Ottawa Street for bridge work.  Project complete: December.  All work is weather permitting.

17. State Route 25: Safety Project
Lucas County (299-15):
  Effective Friday, October 2 at 8pm, through Monday, October 5 at 6am, South Avenue east of the Anthony Wayne Trail will be closed for intersection work.  Detour: Anthony Wayne Trail; Western Avenue; Broadway Street.  Through November, motorists are advised of new a traffic pattern on the Anthony Wayne Trail, from Hippo Way to City Park Boulevard. Additionally, at this time, left turn movements to and from the Anthony Wayne Trail from South Avenue and Western Avenue will be permitted.

Through November 2016, the Anthony Wayne Trail, between Hippo Way and City Park Boulevard, is reduced to two lanes for intersection safety improvements and pavement replacement.  Project complete: November 2016.  All work is weather permitting.

18. State Route 25: Soil Boring

Lucas County:  Effective Monday, October 5, through Wednesday, October 7, daily from 7am to 5pm, intermittent lane restrictions are possible on the Anthony Wayne Trail/SR 25 near City Park Avenue, for soil boring.  For more information, contact The Mannik & Smith Group at 419-891-2222.  All work is weather permitting.

19. State Route 64: Roundabout and Realignment
Lucas County (143-15): 
Through October, intermittent lane restrictions are possible on SR 64 at Finzel Road for finish work.  Project complete: October.  All work is weather permitting.    

 

20. McCord Road: Underpass Construction *UPDATE*
Lucas County (236-14):  Effective Saturday, October 10, from 7am until 7pm, the Spectrum Drive by-pass road and the roundabout at North Mall Drive/Hall Road and McCord Road will be closed for pavement repair. Detour: Airport Highway/SR 2; Holland Sylvania Road; Hill Avenue.
  Through September 2016, McCord Road between North Mall Drive/Hall Road and Spectrum Drive is closed to vehicular and pedestrian traffic.  Detour: Holland Park Boulevard; North Mall Drive.  Project complete: November 2016.  All work is weather permitting.

21. U.S. Route 6: Pavement Reconstruction and Bridge Work *UPDATE*
Wood County (170-14):
  Through June 2016, the ramp from southbound I-75 to eastbound US 6 is closed.  Detour: westbound US 6; SR 25.  Through June 2016, US 6, between SR 25 and Dunbridge road, is reduced to one lane in each direction.  Lane widths are restricted to 11ft in this work zone.  Work complete: June 2016.  All work is weather permitting.

22. State Route 64: Slide Repair *UPDATE*
Wood County (155-15):
  Through Friday, October 9, a temporary traffic signal will be used to maintain one lane of traffic on SR 64, between Reitz Road and SR 64/65 Waterville Bridge for slide repair.  Through October, intermittent lane restrictions are possible within this work zone for slide repair.  Project complete: November.  All work is weather permitting.

23. State Route 105: Resurfacing *UPDATE*

Wood County (99-15): Through October, intermittent lane restrictions are possible on SR 105, between Pemberville Road and US 23, for resurfacing.  Traffic will be maintained by flaggers.  Project complete: October.  All work is weather permitting.

24. State Route 235: Resurfacing

Wood County (441-15):  Through November, SR 235, between Willow Road and Old Coach Road, will be closed for resurfacing.  Detour: US 6; SR 65.  Project Complete: November.  All work is weather permitting.

 

25. State Route 420: Safety Improvements

Wood County (423-14):  Through October, short-term, intermittent lane restrictions are possible on southbound I-280, between SR 795 and SR 163, and on SR 420, between SR 163 and I-80/I-90, for finish work.  Project complete: October.  All work is weather permitting.

26. State Route 582: Bridge Rehabilitation

Wood County (154-15):  Through October, SR 582, between Stony Ridge Road and Layman Road is closed for bridge rehabilitation.  Detour: SR 199; SR 105; US 23.  Project complete: October.  All work is weather permitting. 

 

27. Park Avenue: Bridge Replacement *PROJECT COMPLETE*

Wood County (3028-15):  The intermittent lane restrictions on Park Avenue in Fostoria, between Lincoln Avenue and Kennedy Lane, for finish work are complete.

28. Jerry City Road: Bridge Replacement

Wood County (3028-15):  Through September, Jerry City Road, between Rudolph Road and Mitchell Road, is closed for bridge replacement.  Detour: Rudolph Road; Cygnet Road; Mitchell Road.  Through October, Jerry City Road, between Wingston Road and Potter Road, is closed for bridge replacement.  Detour: Wingston Road; Cygnet Road; Potter Road.  Project complete: November.  All work is weather permitting.

29. Tracy Road: Bridge Replacement

Wood County (3040-15):  Through November, Tracy Road, between Welling Road and Latcha Road, is closed for bridge replacement.  Detour: Latcha Road; Oregon Road; US 20.  Project complete: November.  All work is weather permitting.

30. Caris Road: Culvert Replacement *CLOSURE BEGINS MONDAY*
Wood County (312-15):
Effective Monday, October 5, through October, Caris Road, between SR 582 and Devils Hole Road, is closed for culvert replacement.  Detour: SR 582; SR 199; Devils Hole Road.  Additionally at this time, intermittent lane restrictions are possible on SR 582 at Caris Road. Traffic will be maintained by flaggers.  Project complete: October. All work is weather permitting.

31. Five Point Road: Bridge Replacement *CLOSURE BEGINS MONDAY*

Wood County (3040-15):  Effective Monday, October 5, through November, Five Point Road, between SR 199 and Thompson Road, will be closed for bridge replacement.  Detour: SR 199; Dowling Road; Lime City Road.  Project complete: December.  All work is weather permitting.

 

Ottawa/Sandusky/Seneca Counties

 

32. State Route 2: Lightner Road Bridge Widening

Ottawa County (232-15):  Through August 2016, intermittent lane restrictions are possible on SR 2, between SR 53/SE Catawba Road and SR 269, for bridge work.  Additionally, Lightner Road, between Kirk Road and East State Road, may be reduced to one lane for temporary pavement construction.  Traffic will be maintained by flaggers.  Additional restrictions will be announced.  Project complete: September 2016.  All work is weather permitting.

33. State Route 163: Culvert Replacement *NEW WORK*

Ottawa County:  Effective Tuesday, October 13, through Friday, October 23, SR 163, between Behlman Road and Leutz Road, will be closed for culvert replacement.  Detour: SR 19; SR 2; SR 358.  Effective Monday, October 19, through October, SR 163, between Lightner Road and SR 269, will be closed for culvert replacement.  Detour: SR 53; SR 2; SR 269 (Exit 125A).  All work is weather permitting.


34. U.S. Route 6: Roundabout Construction
Sandusky County (8018-15
):  Through October, a temporary traffic signal is used to maintain one lane of traffic on US 6/SR 53, between Napoleon Road and Muskellunge Creek Road.  Through October, Muskellunge Creek Road, between Spieldenner Road and Gerwin Road, is closed.  Project complete: November.  All work is weather permitting.

35. State Route 412: Culvert Replacement *CLOSURE BEGINS MONDAY*

Sandusky County:  Effective Monday, October 5, through Friday, October 9, SR 412, between Rockwell Road/TR 310 and SR 101, will be closed for culvert replacement.  Detour: SR 101; US 20; SR 510.  All work is weather permitting.

36. State Route 510: Culvert Replacement *UPDATE*

Sandusky County:  Through Saturday, October 3, SR 510, between US 6 and SR 412, will be closed for culvert replacement.  Detour: US 6; US 20; SR 412 (Exit 103).  All work is weather permitting.

37. U.S. Route 23: Culvert Replacements *WORK COMPLETE*
Seneca County:  US 23, between TR 96 and US 224, is now open.  The culvert replacements are complete.

38. State Route 19: Culvert Replacement

Seneca County (237-15):  Through October, lane restrictions are possible on SR 19, between US 224 and CR 58/Crawford Seneca County Line Road, for resurfacing. Traffic will be maintained by flaggers.  Project complete: October.  All work is weather permitting.

Williams/Fulton/Henry Counties

39. State Route 107: Bridge Rehabilitation *UPDATE*
Williams County (153-15):
 Through October, intermittent lane restrictions are possible on SR 107, between CR 8 and CR 9 for finish work.  Traffic will be maintained by flaggers.  Project complete: October.  All work is weather permitting.

40. County Road 49/County Road 16: Bridge Replacement

Williams County (3036-15):  Through October, CR 49/CR 16, between CR I50 and CR J, will be closed for bridge replacement. Detour: CR J; SR 15; CR G. Project complete: November.  All work is weather permitting.

41. State Route 120: Culvert Replacement *CLOSURE BEGINS MONDAY*

Fulton County:  Effective Monday, October 5 through Saturday, October 10, SR 120, between CR 15-1 and CR 14-2, will be closed for culvert replacement.  Detour: Michigan SR 156; SR 108; US 20; SR 109.  Effective Monday, October 12, through Saturday, October 17, SR 120, between SR 109 and CR 7, will be closed for culvert replacement.  Detour: SR 109; US 20; SR 64.  All work is weather permitting.

42. State Route 18: Culvert Replacement *PROJECT COMPLETE*

Henry County (160-15):  SR 18, between CR 16 and CR 18, is open.  The culvert replacement project is complete.

43. State Route 109: Damascus Bridge: Bridge Replacement

Henry County (1-15):  Through October 2017, motorists should watch for additional truck traffic near SR 109 at the Damascus bridge for bridge work.  Work impacting traffic will be announced.  Project complete: October 2017.  All work is weather permitting.

District Wide 

                                                                                                                                                      

44. Various Routes: Guardrail & Electrical Maintenance

District Wide (1071-14 & 1076-14):  Through December, intermittent lane restrictions are possible district wide for guardrail and electrical maintenance.  Project complete: December. All work is weather permitting.

Leave a Reply

Your email address will not be published. Required fields are marked *

NBX powered by PANDA Technologies
NBLS Website