A small portion of the I – 75 widening project includes work on the bridges east of North Baltimore. This is the bridge (or viaduct) over Eagleville Road.
CLICK LINK to view pdf – ODOT D 2 Construciton Update Nov. 13

Ohio Department of Transportation • Construction Update
DISTRICT 2 • TODD M. AUDET, P.E., DEPUTY DIRECTOR
317 East Poe Rd. • Bowling Green, Ohio 43402-1330
www.transportation.ohio.gov/dist2
ODOT District Two Weekly Construction Update
For Immediate Release
Thursday, November 12, 2015
Updates are highlighted in bold and underlined.
Lucas/Wood Counties
1. Interstate 75: Widening *LANE RESTRICTIONS THIS WEEKEND*
Wood & Hancock Counties (170-14, 199-14, 237-14 & 3000-14):
Interstate Restrictions:
Effective Friday, November 13 at 8pm, through Saturday, November 14 at 2pm, southbound I-
75, between Dowling Road and Devil’s Hole Road, will be reduced to one lane for ramp
widening.
Through November 2016, overnight, from 7pm until 6am, single lane restrictions are possible on I-
75 between the I-75/I-475 interchange in Perrysburg and CR 99 in Hancock County. Through 2016,
southbound I-75 is reduced to two lanes from US 20 to I-475 in Perrysburg. Through 2016, 11-foot
lane width restrictions are in place on I-75 between US 20 in Perrysburg and CR 99 in Hancock
County.
Ramp Restrictions:
Through December, the ramp from southbound I-75 to westbound I-475 is reduced to one
lane.
Through July 2016, 11-foot lane width restrictions are in place on the ramps from northbound
and southbound I-75 to Cygnet Road (Exit 171) and from Cygnet Road to northbound and
southbound I-75.
Local Routes:
Through February 2016, Bays Road at I-75 will be closed for bridge work. Detour: SR 25; SR 281;
Solether Road.
Through November, Jerry City Road at I-75 is closed for bridge work. Detour: SR 25; SR 281;
Solether Road.
Through December, Township Road 101 in Hancock County, between CR 220 and TR 142, is closed
for bridge work over I-75. Project complete: October 2017. All work is weather permitting.
2. Interstate 75: Widening
Lucas County (485-14, 536-14): Through July 2018, overnight, 7pm through 6am, single lane
restrictions are possible on I-75, from I-475 in Toledo to I-280 for bridge work. Through fall 2016,
one lane of I-75 traffic is maintained in the current northbound lane and one lane of traffic is
relocated to southbound I-75 and separated by barrier wall.
The following ramps are closed:
Through June 2016, the ramp from Phillips Avenue to northbound I-75. Detour:
Manhattan Boulevard; Lagrange Street; South Expressway Drive.
Through July 2016, the ramp from southbound I-75 to Phillips Avenue (Exit
206). Detour: North Expressway Drive (Exit 207); Stickney Avenue; South
Expressway Drive.
Through August 2016, the ramp from northbound I-75 to Jeep Parkway
(Exit 205A). Detour: Berdan Avenue (Exit 205B); Detroit Avenue.
Through October 2016, the ramp from northbound I-75 to Phillips Avenue (Exit
206). Detour: south Expressway Drive (Exit 207); Stickney Avenue; North
Expressway Drive.
Through July 2018, the ramp from Jeep Parkway to southbound I-75. Detour: Berdan
Avenue.
Through July 2018, the ramp from Willys Parkway to northbound I-75. Detour:
Berdan Avenue; Detroit Avenue; Phillips Avenue.
Through July 2018, the ramp from southbound I-75 to Willys Parkway
(Exit 205A). Detour: Detroit Avenue (Exit 203B).
Local Streets:
Through November, expect lane restrictions on Phillips Avenue at I-75, Lagrange Street at I-75,
Berdan Avenue at I-75, Detroit Avenue at I-75, and Stickney Avenue at I-75 for bridge work.
Through June 2016, South Expressway Drive is restricted to a single lane between Stickney Avenue
and Lagrange Street.
Through August 2016, Jeep Parkway from Central Avenue to Berdan Avenue is closed. Central
Avenue; Detroit Avenue; Berdan Avenue.
Through October 2016, the ramp from northbound I-75 to Berdan Avenue is restricted to right turn
only movements. Suggested alternate route: Berdan Avenue; Detroit Avenue; Phillips Avenue;
Haverhill Drive.
Through November 2016, Elm Street and Wersell Avenue at South Expressway Drive, will be
closed.
Through May 2017, the Polish Village Overpass is closed for bridge work. Detour: North
Expressway Drive; Stickney Avenue; South Expressway Drive.
Through July 2018, Willys Parkway from Pioneer Lane to Jeep Parkway is closed.
Project complete: September 2018. All work is weather permitting.
3. Interstate 75: Pavement Rehabilitation
Lucas County (268-14): Through August 2016, I-75, from the I-75/475 split in Toledo to the Anthony Wayne Trail, is reduced to two lanes. Overnight, 10pm through 6am, single lane
restrictions are possible in this work zone.
• The ramp from northbound I-75 to Bancroft Street is now open.
Through August 2016, the following ramps are restricted or closed:
The interchange ramp from eastbound I-475 to southbound I-75 is reduced to one lane.
The interchange ramp from northbound I-75 to westbound I-475 is reduced to one lane.
The ramp from Detroit Avenue to southbound I-75 is closed. Detour: Monroe Street;
Michigan Avenue; SR 25.
The ramp from Detroit Avenue to northbound I-75 is closed. Detour: Monroe Street; 14th
Street.
Through May 2016, Oakwood Avenue, between Wells Street and Grove Place, is closed for bridge
work. Seek alternate route. Project complete: August 2016. All work is weather permitting.
4. Interstate 75: Rest Area Closure
Wood County (170-14): Through July 2016, the northbound and southbound I-75 rest areas are
closed as part of the I-75 widening project. Project complete: July 2016. All work is weather
permitting.
5. Interstate 475: ProMedica Parkway Ramp
Lucas County: Through 2016, the ramp from ProMedica Parkway to eastbound I-475 is closed for
traffic control. Detour: westbound I-475; Douglas Road. All work is weather permitting.
6. Interstate 475/U.S. Route 23: Interchange Upgrade *UPDATE*
Lucas County (184-14 & 210-15): Effective Monday, November 16 at 9pm, through Tuesday,
November 17 at 6am, the ramp from westbound I-475 to southbound I-475/US 23 will be closed for
pavement repair. Work was postponed due to weather. Detour: northbound US 23; Monroe Street
(Exit 234). Through December, the ramp from southbound US 23 to Central Avenue is
closed. Detour: southbound I-475/US23; Airport Highway (Exit 8A). Additionally at this time,
southbound US 23 traffic is reduced to one lane from the I-475/US 23 split in Sylvania to Central
Avenue. The ramp from westbound I-475 to Central Avenue (Exit 13) is open.
Overnight lane restrictions are possible at the interchange of I-475/US 23 from Central Avenue to N.
Holland Sylvania Road. Through October, lane restrictions are possible on Blossman Road, between
Moffat Road and Plainview Drive for bridge work. Traffic will be maintained by flaggers. Project
complete: December. All work is weather permitting.
7. Interstate 475: Bridge Widening
Lucas County (251-13 & 235-14): Through December, Angola Road at I-475 is closed for bridge
replacement. Detour: Holland Park Boulevard; North Mall Drive; McCord Road; Airport Highway;
Holland Sylvania Road.
Through May 2016, overnight from 8pm until 6am, lane restrictions are possible on I-475, between
Angola Road and Salisbury Road/Dussel Drive. 11-foot lane width restrictions are in place on I-475,
between Angola Road and Salisbury Road/Dussel Drive. Project complete: August 2016. All work is
weather permitting.
8. Interstate 475: Noise Wall Installation Lucas County (314-14): Through November, intermittent shoulder restrictions are possible on I-
475, between Corey Road and Woodley Road, for finish work. Project complete: October. All work
is weather permitting.
9. Interstate Maintenance Work
Lucas and Wood Counties: Through December, intermittent overnight lane restrictions are
possible on I-75, I-280 and I-475 in Lucas and Wood counties for maintenance work. Project
complete: December. All work is weather permitting.
10. U.S. Route 20: Central Avenue Interchange Project
Lucas County (210-15): Through September 2017, overnight from 9pm until 6am, lane restrictions
are possible on I-475/US 23 between Dorr Street and the I-475/US 23 interchange. 11-foot lane
width restrictions are in place within the work zone. Additional restrictions will be
announced. Project complete: September 2017. All work is weather permitting.
11. U.S. Route 20: Utility Work *UPDATE*
Lucas County: Effective Monday, November 16 at 9pm, through Tuesday, November 17 at
5am, westbound US 20, between Wilford Drive and Plainview Drive, will be reduced to one
lane for pavement repair. Through November, overnight from 9pm until 6am, lane restrictions are
possible on Central Avenue, between I-475 and Central Park West, for gas line relocation. For more
information, contact Columbia Gas at 1-800-344-4077. All work is weather permitting.
12. U.S. Route 20A: Eber Road Roundabout Project
Lucas County (184-15): The US 20A at Eber Road roundabout is open. Intermittent lane
restrictions are possible on US 20A at Eber Road for finish work. Project complete: November. All
work is weather permitting.
13. State Route 2: Anthony Wayne Bridge Project *UPDATE*
Lucas County (58-13): All lanes of the Anthony Wayne Bridge are now open. Through
November, intermittent lane restrictions are possible and there is no pedestrian access for finish
work. Project complete: May 2016. All work is weather permitting.
14. State Route 2: Pavement Repair
Lucas County: Through Friday, November 13, SR 2, between Lyon Road and Cousino Road, may
be reduced to one lane for pavement repair. Traffic will be maintained by flaggers. All work is
weather permitting.
15. State Route 25: Safety Project
Lucas County (299-15): Through September 2016, southbound (outbound from downtown Toledo)
Anthony Wayne Trail, between Hippo Way and City Park Boulevard, will remain reduced two lanes
of traffic for pavement rehabilitation. Project complete: November 2016. All work is weather
permitting.
16. McCord Road: Underpass Construction
Lucas County (236-14): Through September 2016, McCord Road between North Mall Drive/Hall
Road and Spectrum Drive is closed to vehicular and pedestrian traffic. Detour: Holland Park
Boulevard; North Mall Drive. Project complete: November 2016. All work is weather permitting.
17. Salisbury Road/Dussel Drive: Pavement Repair
Lucas County: Today through Friday, November 13, lane restrictions are possible on Salisbury
Road/Dussel Drive, over I-475, for pavement repair. All work is weather permitting.
18. U.S. Route 6: Pavement Reconstruction and Bridge Work
Wood County (170-14): Through June 2016, the ramp from southbound I-75 to eastbound US 6 is
closed. Detour: westbound US 6; SR 25. Through June 2016, US 6, between SR 25 and Dunbridge
road, is reduced to one lane in each direction. Lane widths are restricted to 11ft in this work
zone. Work complete: June 2016. All work is weather permitting.
19. State Route 64: Slide Repair
Wood County (155-15): Through November, intermittent lane restrictions are possible on SR 64,
between Reitz Road and SR 64/65 Waterville Bridge, for slide repair. Project complete:
November. All work is weather permitting.
20. State Route 582: Bridge Rehabilitation
Wood County (154-15): SR 582, between Stony Ridge Road and Laymen Road is now
open. Through November, intermittent lane closures are possible on SR 582, between Stony Ridge
Road and Layman Road, for finish work. Traffic will be maintained by flaggers. Project complete:
November. All work is weather permitting.
21. Tracy Road: Bridge Replacement *UPDATE*
Wood County (3040-15): Through Friday, November 13, Tracy Road, between Welling Road
and Latcha Road, is closed for bridge replacement. Detour: Latcha Road; Oregon Road; US 20.
Project complete: November. All work is weather permitting.
22. Caris Road: Culvert Replacement *PROJECT COMPLETE*
Wood County (312-15): Caris Road, between SR 582 and Devils Hole Road, is open. The culvert
replacement project is complete.
23. Five Point Road: Bridge Replacement
Wood County (3040-15): Through November, Five Point Road, between SR 199 and Thompson
Road, is closed for bridge replacement. Detour: SR 199; Dowling Road; Lime City Road. Project
complete: December. All work is weather permitting.
Ottawa/Sandusky/Seneca Counties
24. State Route 2: Lightner Road Bridge Widening
Ottawa County (232-15): Through August 2016, intermittent lane restrictions are possible on SR 2,
between SR 53/SE Catawba Road and SR 269, for bridge work. Additionally, Lightner Road,
between Kirk Road and East State Road, may be reduced to one lane for temporary pavement
construction. Traffic will be maintained by flaggers. Additional restrictions will be
announced. Project complete: September 2016. All work is weather permitting.
25. State Route 163: Culvert Replacement *UPDATE*
Ottawa County: Through Friday, November 13, SR 163, between Lightner Road and SR 269, is
closed for culvert replacement. Detour: SR 53; SR 2; SR 269 (Exit 125A). All work is weather
permitting.
26. U.S. Route 6: Roundabout Construction
Sandusky County (8018-15): Through November, a temporary traffic signal is used to maintain one
lane of traffic on US 6/SR 53, between Napoleon Road and Muskellunge Creek Road. Through
November, Muskellunge Creek Road, between Spieldenner Road and Gerwin Road, is
closed. Project complete: November. All work is weather permitting.
27. State Route 19: Railroad repair
Sandusky County: Through Saturday, November 14, SR 19, between East Cole Road and North
Coast Inland Trail, is closed for railroad repair work. Detour: US 20; SR 510; SR 101. All work is
weather permitting.
Williams/Fulton/Henry Counties
28. County Road 49/County Road 16: Bridge Replacement
Williams County (3036-15): Through November, intermittent lane restrictions are possible on CR
49/CR 16, between CR I50 and CR J, for finish work. Project complete: November. All work is
weather permitting.
29. State Route 18: Culvert Replacement *CLOSURE BEGINS MONDAY*
Henry County: Effective Monday, November 16, through Friday, November 20, SR 18, between
CR 10 and CR 11, will be closed for culvert replacement. Detour: SR 108; SR 281; SR 109. All
work is weather permitting.
30. State Route 109: Damascus Bridge: Bridge Replacement
Henry County (1-15): Through October 2017, motorists should watch for additional truck traffic
near SR 109 at the Damascus bridge for bridge work. Work impacting traffic will be announced.
Project complete: October 2017. All work is weather permitting.
District Wide
31. Various Routes: Guardrail & Electrical Maintenance
District Wide (1071-14 & 1076-14): Through December, intermittent lane restrictions are possible
district wide for guardrail and electrical maintenance. Project complete: December. All work is
weather permitting.
For more information contact:
The District Two Public Information Office at (419) 373-4428