1. Interstate 75: Widening
Wood & Hancock Counties (170-14, 199-14, 237-14 & 3000-14):
Interstate Restrictions

Through 2016, southbound I-75 is reduced to two lanes from US 20 to I-475 Perrysburg.  Through October, overnight from 8pm until 6am, single lane restrictions and traffic shifts are possible on I-75, from US 20 in Perrysburg to CR 99 in Hancock County, for pavement repair.  Through 2016, 11-foot lane width restrictions are in place on I-75 between US 20 in Perrysburg to CR 99 in Hancock County.

State/Local Route Restrictions

·         Through November, SR 582 is reduced to one lane over I-75 for slope repair.  Traffic is maintained by signal.

·         Through November, Bays Road at I-75, and Jerry City Road at I-75 are closed for bridge work.  Detour:  SR 25; SR 281; Solether Road.

Additional restrictions will be announced.  Project complete: August 2017.  All work is weather permitting.

2. Interstate 75: Pavement Rehabilitation *UPDATE*
Lucas County (268-14):
  Through July 2015, I-75, from the I-75/475 split in Toledo to the Anthony Wayne Trail, is reduced to two lanes.  Effective Monday, November 3 through April 2015, Oakwood Avenue, between Wells Street and Grove Place, will be closed for bridge work.  Seek alternate route. Through July 2016, the following ramps will be restricted or closed:

·         The interchange ramp from eastbound I-475 to southbound I-75 is reduced to one lane.

·         The interchange ramp from northbound I-75 to westbound I-475 is reduced to one lane.

·         The ramp from Detroit Avenue to southbound I-75 is closed.  Detour: Monroe Street; Michigan Avenue; SR 25.

All work is weather permitting.  Project complete: July 2016

3. Interstate 75: Bridge Deck Repair *NEW PROJECT*
Lucas County (1090-14):
Effective Monday, November 3, through December, intermittent lane restrictions are possible on I-75 from Wales Road to I-280.  At least two lanes of I-75 will be maintained during peak travel times, 6am until 7pm.  Project complete: May 2015.

4. Interstate 475/U.S. Route 23: Interchange Upgrade
Lucas County (184-14):
 Through December 2015, overnight from 8pm until 6am, shoulder and overnight lane restrictions are possible at the interchange of I-475/US 23 from Central Avenue to N. Holland Sylvania Road.  Through November, intermittent lane restrictions are possible on Blossman Road, between Fairbanks Avenue and Plainview Drive, for bridge work. Traffic will be maintained by flaggers.  Additional closures and restrictions will be announced.  Project complete: December 2015.  All work is weather permitting.

5. Interstate 475: Bridge Widening                          

Lucas County (251-13 & 235-14): Interstate Restrictions

Through May 2016, overnight from 8pm until 6am, lane restrictions are possible on I-475, between Angola Road and Salsibury Road/Dussel Drive.  11-foot lane width restrictions are in place on I-475, between Angola Road and Salsibury Road/Dussel Drive.  Through June 2016, lane and shoulder restrictions are possible on the Ohio Turnpike (I-80/I-90) at the I-475 bridge.

Local Route Restrictions

·         Through December, Angola Road will be closed at I-475 for bridge widening.  Detour: McCord Road; Airport Highway; Holland Sylvania Road.

·         Through June 2015, Manley Road at the Ohio Turnpike Bridge will be closed.

Project complete: June 2016.  All work is weather permitting.

6. Interstate 475: Resurfacing Project

Lucas and Wood Counties (32-14): Through November, overnight from 7pm until 6am, lane restrictions are possible on I-475, from SR 25 to US 20A, for resurfacing. Project complete: November.  All work is weather permitting.

7.  Interstate 475: Noise Wall Installation

Lucas County (314-14):  Through June of 2015, shoulder restrictions are possible on I-475, from Corey Road to Woodley Road, for noise wall installation.  Overnight lane restrictions on I-475 will be announced.  Project complete: June 2015.  All work is weather permitting.

8. Interstate 475:  Pavement Repair *NEW WORK*

Lucas County:  On Sunday, November 2, at 8pm, through Monday, November 3, at 6am, both directions of I-475 between Douglas Road and Monroe Street, will be restricted to one lane for pavement repair.  Additionally at this time, the ramp from Monroe Street to eastbound I-475 will be closed.   Detour: Central Avenue; Secor Road.  All work is weather permitting.

9. Interstate 475: Lighting Maintenance *WORK COMPLETE*
Lucas County:
Electrical maintenance work on I-475, from I-75 to Rushland Avenue is now complete.

10. Interstate 280: Resurfacing and Bridge Repair
Wood County (174-13):
 Through November, both directions of I-280, between Woodville Road and SR 2, are reduced to one lane of for drainage repair.   Project complete: November.  All work is weather permitting.

11. Interstate 280: Pavement Repair
Wood County:
  Through Friday, October 31, from 8am until 3pm, single lane restrictions are possible in both directions on I-280, from Walbridge Road to the Ohio Turnpike for pavement repair.  All work is weather permitting.

12. State Route 2: Anthony Wayne Bridge Project *UPDATE*

Lucas County (58-13): Through September 2015, the Anthony Wayne Bridge is closed to vehicular and pedestrian traffic.  Detour: Oak Street; Fassett Street; Miami Street; I-75; Anthony Wayne Trail (Exit 201B);

Monroe Street; Summit Street.

Local Route Restrictions

·         Through November, Miami Street, between Stratton Street and Greenwood Avenue will be closed for bridge work. Detour: Fassett Street; Oak Street.

·         Through November, daytime intermittent lane restrictions are possible on Boers-Boyer Way.   Traffic will be maintained by flaggers.

Project complete: December 2015.  All work is weather permitting.

13. U.S. Route 20: Holland Sylvania Road & Reynolds Road Intersection Improvements

Lucas County (145-14 & 252-14):  Through December, lane and shoulder restrictions are possible at the intersection of Central Avenue and Holland Sylvania Road for utility work and widening.  Left turn lanes will be maintained.  Through December, intermittent lane restrictions are possible at the intersection of Central Avenue and Reynolds Road for safety improvements.  Project complete: July 2015.   All work is weather permitting.

 

14. State Route 65: Bridge Painting *UPDATE*

Lucas County (395-13): Through November, intermittent lane restrictions are possible on the Craig Bridge (SR 65), between Front Street and Summit Street, for bridge painting. Project complete: October.  All work is weather permitting.

15. McCord Road: Underpass Construction

Lucas County (236-14): Through November, intermittent lane restrictions are possible on McCord Road, from Hall Street to Kipling Drive, for rail and road work.  Project complete November 2016.  All work is weather permitting.

16.  U.S. Route 6: Pavement Reconstruction
Wood County (14-170):
  Through April 2015, the following ramps are closed for pavement reconstruction:

·         The ramp from southbound I-75 to eastbound US 6.  Detour: westbound US 6; SR 25.

·         The ramp from northbound I-75 to westbound US 6.  Detour: eastbound US 6; Dunbridge Road; Wooster Street (SR 105); southbound I-75.

Through April 2015, US 6, between SR 25 and Dunbridge road, will be reduced to one lane in each direction.  Motorists should be aware of traffic shifts in this area.  Lane widths will be restricted to 11ft in this work zone.  Work complete: May 2015.

17. State Route 18: Resurfacing  *UPDATE*
Wood County (402-14):
Through November, intermittent lane restrictions are possible on SR 18, from Mitchel Road in North Baltimore to Rose Street, in Bloomdale for finish work.  Project complete: November.  All work is weather permitting.

18. State Route 25: Intersection Safety Improvement   *PROJECT COMPLETE*

Wood County (8022-14):  Work on SR 25, between Roachton Road and Reitz Road now complete.

19. State Route 64: Signal Upgrade

Wood County (90-14): Through November, weekday intermittent lane restrictions are possible on Wooster Street (SR 64), from Dunbridge Road to Thurstin Avenue.   Intermittent weekday lane restrictions are also possible on SR 25 at Newton Road.  Project complete: November.  All work is weather permitting.

20. State Route 65: Resurfacing & Bridge Work

Wood County (159-14): Through November, lane restrictions are possible on SR 65, from W. Boundary Street (SR 25) to SR 64 (Waterville bridge), for finish work.  Traffic will be maintained by flaggers.  Project complete:  November.  All work is weather permitting.

21. State Route 420: Safety Improvements

Wood County (423-14): Through December, lane restrictions are possible on SR 420, between SR 163 to

I-280, for widening. Project complete: July 2015.  All work is weather permitting.

22. State Route 420: Pavement Repair *NEW WORK*
Wood County:
  On Monday, November 3, from 9am until 3pm, the ramp from southbound SR 420 to eastbound US 20 will be closed for pavement repair.  Detour: SR 163.  All work is weather permitting.

23. State Route 795: Intersection Safety Improvement
Wood County (8022-14):
  Through November, SR 795, from Simmons Road to Lime City Road, is reduced to one lane for turn lane installation.  Project complete: November.  All work is weather permitting.

24. Gypsy Lane Road: Bridge Repair

Wood County: Through December, Gypsy Lane Road over I-75 is closed for bridge repair.   Detour: Dunbridge Road; Napoleon Road; Campbell Hill Road.  All work is weather permitting.

25. Various Routes: County Bridge Replacement
Wood County (3013-14):
The following bridges are closed for replacement:

·         Through November, Mermill Road, between SR 25 and I-75, will be closed.  Detour: SR 25; SR 281; Huffman Road.

·         Through November, Jerry City Road, between Emerson Road and Linhart Road, will be closed.  Detour: Emerson Road; Cygnet Road; SR-199.

·         Through November, Owen Road, between Walbridge Road and Plumey Road, will be closed.  Detour: Walbridge Road; Pemberville Road; SR 51.

·         Through November, Bradner Road, between SR 795 and Collins Road, will be closed.  Detour: SR 795; Pemberville Road; Collins Road.

Additional bridges and restrictions will be announced.  Project complete: December.  All work is weather permitting.

Ottawa/Sandusky/Seneca Counties

26. State Route 2: Mine Remediation

Ottawa County (27-13):  Through May 2015, SR 2 between SR 163 and SR 53 is reduced to one lane in each direction for mine remediation.  Additionally, at this time, the ramp from southbound SR 53 to westbound SR 2 is closed.  Detour: SR 53; SR 163.  Project complete: May 2016.  All work is weather permitting.

 

27. State Route 2: Resurfacing and Bridge Repair
Ottawa County (611-13):
Through November, SR 2, between West Camp Perry Western Road and North Camp Perry Eastern Road, is reduced to one lane for resurfacing and bridge work.  Lane widths are reduced to 10 feet within this work zone.  Through November, no left turns are permitted from eastbound SR 2 to Camp Perry East Road and from Camp Perry East Road to eastbound SR 2.  Detours are posted.  Project complete: November.  All work weather permitting.

 

28. State Route 105: Training Exercise

Ottawa County: On Saturday, November 8, from 7am until 7pm, SR 105, between South Toussaint-Portage Road and SR 163, in Oak Harbor, may be closed for a fire training exercise. Detour: SR 590; SR 163.  For more information contact the Portage Fire District at (419) 898-3109.

29. State Route 579: Railroad Repair

Ottawa County: Through Friday, October 31, SR 579 between Martin Williston Road and North Opfer Lentz Road, will be closed for railroad repair.  Detour: SR 590; SR 163; SR 51.  All work is weather permitting.

30. State Route 412: Pavement and Bridge Repair *UPDATE*
Sandusky County (423-14):
Work on SR 412 from US 20 to SR 101 for resurfacing and pavement repair will resume spring 2015.

31. U.S. Route 224: Resurfacing and Bridge Repair *UPDATE*

Seneca County (151-14): Through November, intermittent lane restrictions are possible on US 224, from SR 67 to SR 100 for resurfacing.   Traffic will be maintained by flaggers.  Project complete: November.  All work is weather permitting.

32. State Route 18: Culvert Replacement

Seneca County: Effective Wednesday, November 5, through Saturday, November 22, SR 18 between TR 109 and CR 48 will be closed for culvert replacement.  Detour: US 224; SR 587.  All work is weather permitting.

Williams/Fulton/Henry Counties

33. County Road 424: Stone Arch Replacement
Henry County (607-12)
Through April 2015, CR 424, between SR 109 and TR 6C, will be closed for stone arch repair.  Detour: SR 295; US 24; SR 109.  Project complete: April 2015.  All work is weather permitting.

District Wide 

 

34. Various Routes: Intelligent Traffic System (ITS)

Lucas County (86-12): Through November, intermittent shoulder restrictions are possible on various routes in the Toledo Metro area for the installation of devices associated with the ITS project.  Project complete: November.  All work is weather permitting.

35. Various Routes: Guardrail & Electrical Maintenance *UPDATE*

District Wide (1025-13 & 1022-13): On Monday, November 3, at 9pm through Tuesday, November 4, until 6am, intermittent lane restrictions are possible in both directions of I-475 between US 23 and I-75 for lighting maintenance.  Through December, intermittent lane restrictions are possible district wide for guardrail and electrical maintenance.  All work is weather permitting.