ODOT District Two Weekly Construction Update – April 24

ODOT District Two Weekly Construction Update – April 24

Photos by JP Miklovic from above I – 75, near the 170 milepost, from the Oil Center Road Overpass

I - 75 April 2015 3
North from Oil Center Road
I - 75 April 2015 2
South from Oil Center Road
I - 75 April 2015 3
Exit 167 Eagleville Road at North Baltimore

Lucas/Wood Counties 

1. Interstate 75: Widening *UPDATE*

Wood & Hancock Counties (170-14, 199-14, 237-14 & 3000-14): Through 2016, southbound I-75 is reduced to two lanes from US 20 to I-475 in Perrysburg. Through November, from 7pm until 6am, single lane restrictions are possible on I-75 between the I-75/I-475 interchange in Perrysburg to CR 99 in Hancock County.

Effective Sunday, April 26 through Saturday, May 2, overnight from 7pm until 6am,  I-75, between SR 18 and CR 99, will be reduced to one lane for shoulder work.

Through 2016, 11-foot lane width restrictions are in place on I-75 between US 20 in Perrysburg to CR 99 in Hancock County.

Effective Monday, April 27, through December, Township Road 101 in Hancock County, between CR 220 and TR 142, will be closed for bridge work over I-75. Project complete: October 2017.  All work is weather permitting.

2. Interstate 75: Widening
*MAJOR TRAFFIC PATTERN CHANGE EFFECTIVE MONDAY*
Lucas County (485-14, 536-14): 
Project to widen I-75 from I-475 in Toledo to I-280.  Through July 2018, single lane restrictions are possible on I-75, from I-475 in Toledo to I-280 for traffic shifts.  Motorists are advised of traffic pattern changes in this work zone.

Effective Sunday, April 26 at 8pm, through November 2016, the ramp from northbound I-75 to Phillips Avenue (Exit 206) will be closed.  Detour: South Expressway Drive (Exit 207); Stickney Avenue; North Expressway Drive.

By Monday, April 27, through fall 2016, motorist should expect changes in traffic flow on northbound I-75, from Berdan Avenue to Lagrange Street.  One lane of I-75 traffic will be maintained in current northbound lanes, one lane of traffic will be relocated to southbound I-75 and separated by barrier wall.

Effective Monday, April 27 at 10pm through Tuesday, April 28 at 6am, eastbound I-475 to northbound I-75 may be closed for traffic shift and pavement markings.  Detour: southbound I-75 (Exit 20A); Detroit Avenue (Exit 203B).

Effective Tuesday, April 28, at 10pm through Wednesday April 29, at 6am, lane restrictions are possible on southbound I-75 from I-280 to Lagrange Street intermittent short term ramp restrictions are possible on North Expressway Drive.

Beginning Tuesday, April 28, at 10pm, through June 2016, the ramp from southbound I-75 to Philips Avenue (Exit 206) will be closed.  Detour: North Expressway Drive (Exit 207); Stickney Avenue; South Expressway Drive.

On Monday, May 4, through May 2017, the Polish Village Overpass will be closed for bridge work.  Detour: North Expressway Drive; Stickney Avenue; South Expressway Drive.

The following ramps are closed:

·         Through June 2016, the ramp from Phillips Avenue to northbound I-75 is closed.  Detour: Manhattan Boulevard; Lagrange Street; South Expressway Drive.

·         The ramp from North Cove Boulevard to westbound I-475 is permanently closed.  Detour: Central Avenue; Detroit Avenue; Phillips Avenue.

·         The ramp from eastbound I-475/northbound I-75 to Jeep Parkway is permanently closed.  Detour: Philips Avenue (Exit 206); Detroit Avenue; Berdan Avenue.

·         Through July 2016, the ramp from northbound I-75 to Jeep Parkway (Exit 205A).  Detour: Berdan Avenue (Exit 205B); Detroit Avenue.

·         Through July 2018, the ramp from Jeep Parkway to southbound I-75.  Detour: Berdan Avenue.

·         Through July 2018, the ramp from Willys Parkway to northbound I-75.  Detour: Berdan Avenue; Detroit Avenue; Philips Avenue.

·         Through July 2018, the ramp from southbound I-75 to Willys Parkway (Exit 205A).  Detour: Detroit Avenue (Exit 203B).
Local Streets:

Effective immediately, through July, expect lane restrictions on Phillips Avenue at I-75 and on Lagrange Street at I-75 for bridge work.

Through June 2016, Jeep Parkway from Central Avenue to Berdan Avenue is closed.  Central Avenue; Detroit Avenue; Berdan Avenue.

Through July 2018, Willys Parkway from Pioneer Lane to Jeep Parkway is closed.

Project complete: July 2018.  All work is weather permitting.

3. Interstate 75: Pavement Rehabilitation
Lucas County (268-14):
Through July, I-75, from the I-75/475 split in Toledo to the Anthony Wayne Trail, is reduced to two lanes. Through April, Oakwood Avenue, between Wells Street and Grove Place, will be closed for bridge work.  Seek alternate route.  Through July 2016, the following ramps will be restricted or closed:

·         The interchange ramp from eastbound I-475 to southbound I-75 is reduced to one lane.

·         The interchange ramp from northbound I-75 to westbound I-475 is reduced to one lane.

·         The ramp from Detroit Avenue to southbound I-75 is closed.  Detour: Monroe Street; Michigan Avenue; SR 25.

Additional ramp closures will be announced.  Project complete: July 2016.  All work is weather permitting.

4. Interstate 75: Pavement Repair *NEW WORK*

Wood County: Effective Friday, April 24, from 9am until 12pm single lane restrictions are possible on northbound I-75 between Buck Road and Wales Road for pavement repair. All work weather permitting.

5. Interstate 75: Drainage Work *NEW WORK*

Wood County: Effective Friday, April 24, from 8am until 3pm, single lane restrictions are possible on southbound I-75 between Bates Road and the Ohio Turnpike for drainage work.  All work is weather permitting.

6. Interstate 475/U.S. Route 23: Interchange Upgrade
Lucas County (184-14):
Lane restrictions are possible at the interchange of I-475/US 23 from Central Avenue to N. Holland Sylvania Road.  Through April, lane restrictions are possible on Blossman Road, between Moffet Road and Plainview Drive for bridge work.  Traffic will be maintained by flaggers.  Project complete: December.  All work is weather permitting.

7. Interstate 475: Bridge Widening                           

Lucas County (251-13 & 235-14): Through July, the ramp from Airport Highway to southbound I-475 is closed for bridge repair.  Detour: I-475; Central Avenue (Exit 13). Through May 2016, overnight from 8pm until 6am, lane restrictions are possible on I-475, between Angola Road and Salsibury Road/Dussel Drive.  11-foot lane width restrictions are in place on I-475, between Angola Road and Salsibury Road/Dussel Drive.  Through June 2016, lane and shoulder restrictions are possible on the Ohio Turnpike (I-80/I-90) at the I-475 bridge.  Through June, Manley Road at the Ohio Turnpike Bridge is closed.   Project complete: June 2016.  All work is weather permitting.

8. Interstate 475: Noise Wall Installation *UPDATE*  

Lucas County (314-14): Through May, weekdays from 10am until 4pm, and on Saturday’s from 7:30am until 4pm, eastbound I-475, between Corey Road and Talmadge Road, is reduced to one lane for post installation.  Through June, shoulder restrictions are possible on I-475, from Corey Road to Woodley Road, for noise wall installation.  Overnight lane restrictions on I-475 will be announced.  Project complete: June.  All work is weather permitting. 

9. Interstate 475: Bridge Deck Replacement
Lucas County (480-14):
Through August, overnight from 9pm until 6am, single lane restrictions are possible on I-475 at Bancroft Street for bridge replacement.  Through August, expect shoulder restrictions on I-475 at Bancroft Street for bridge repair. Though July, Bancroft Street at I-475 is closed for bridge replacement.  Detour: Holland-Sylvania Road; Dorr Street; McCord Road.  Project complete: August.  All work is weather permitting.

10. State Route 2: Anthony Wayne Bridge Project 

Lucas County (58-13): Through November, the Anthony Wayne Bridge is closed to vehicular and pedestrian traffic.  Detour: Oak Street; Fassett Street; Miami Street; I-75; Anthony Wayne Trail (Exit 201B); Monroe Street; Summit Street.  Through June, Miami Street between Nevada Street and Greenwood Avenue, is closed for bridge work.  Detour: Fassett Street; Oak Street.  Through April, Utah Street at the Anthony Wayne bridge will be closed for bridge work. Detour: Nevada Street; Yondota Street; Greenwood Avenue.  Project complete: December.  All work is weather permitting.

11. McCord Road: Underpass Construction
Lucas County (236-14):
Through September 2016, northbound McCord Road, between North Mall Drive/Hall Street and Spectrum Drive, is closed.  Detour: Airport Highway; Holland Sylvania; Angola Road.  Through April, southbound McCord Road, between North Mall Drive/Hall Street and Spectrum Drive, is reduced to one lane for traffic maintenance.  On Friday, May 1, through September 2016, southbound McCord Road, between Spectrum Drive and North Mall Drive/Hall Street will be closed to vehicular and pedestrian traffic.  Project complete: November 2016.  All work is weather permitting.

12. U.S. Route 20: Holland Sylvania Road & Reynolds Road Intersection Improvements
Lucas County (145-14 & 252-14):
 Through June, lane restrictions are possible on Central Avenue from Fairbanks Avenue to Reynolds Road for median installation.  Additionally, through June, expect lane restrictions on Holland-Sylvania Road, between Huntingfield Boulevard to Bonsels Parkway for median installation.  Through June, intermittent lane restrictions are possible at the intersection of Central Avenue and Reynolds Road for safety improvements.  Project complete: July.  All work is weather permitting

13. Various Routes: Bridge Painting
Lucas County (8027-14):
 Through April, the right turn lane from southbound Summit Street (SR 51/65) to Oliver Street may be restricted for bridge painting.  Suggested alternate route: Clayton Street.  Work on Miami Street (SR 65) and on US 24 near Fallen Timbers will be announced.  Project complete: December.  All work is weather permitting.

14. U.S. Route 6: Pavement Reconstruction and Bridge Work *UPDATE*
Wood County (170-14):
Effective Thursday, May 7, at 9pm through Friday, May 8 at 5am, US 6, between County Home Road and SR 25 will be closed for beam installation.  Detour eastbound US 6:  southbound I-75; Cygnet Road (Exit 171); northbound I-75. Detour westbound US 6: northbound I-75; SR64/SR105 (Exit 181); southbound I-75.  Through October, US 6, between SR 25 and Dunbridge road, is reduced to one lane in each direction.  Lane widths are restricted to 11ft in this work zone.  Through October, the ramp from southbound I-75 to eastbound US 6 is closed.  Detour: westbound US 6; SR 25.  Work complete: October.  All work is weather permitting.

15. State Route 65: Resurfacing
Wood County (587-14):
Through August, daytime intermittent lane restrictions are possible on SR 65, between SR 235 to SR 64 for resurfacing.  Lane width restrictions of 10.5 feet are possible in this work zone.  Traffic will be maintained by flaggers.  Project complete: August.  All work is weather permitting.

16. State Route 281: Bridge Replacement

Wood County (442-14): Through May, SR 281, between SR 25 and Solether Road, is closed for bridge replacement. Detour: SR 25; US 6; SR 199. Project complete: June.  All work is weather permitting. 

17. State Route 420: Safety Improvements

Wood County (423-14): Through July, northbound SR 420, between SR 163 and Libbey Road, is reduced to one lane for widening.  The left turn lane from southbound SR 420 to Libbey Road is permanently closed.  Motorists use the newly built turnaround. 11-foot lane width restrictions are in place on northbound SR 420.  Project complete: July.  All work is weather permitting.

18. Gypsy Lane Road: Bridge Repair   

Wood County (1093-14): Through July, Gypsy Lane Road over I-75 is reduced to one lane for bridge repair.  Traffic is maintained by automated signal.  Project complete: July.  All work is weather permitting.

Ottawa/Sandusky/Seneca Counties

19. State Route 2: Guardrail Repair *NEW WORK*

Ottawa County: Effective Friday, April 24, from 7am until 2pm, single lane restrictions are possible on westbound SR 2, between SR 53 and SR 163, for guardrail repair.  All work is weather permitting 

20. State Route 2: Mine Remediation
Ottawa County (27-13): 
Through June, SR 2, between SR 163 and SR 53, is reduced to one lane in each direction for mine remediation.  Additionally, at this time, the ramp from southbound SR 53 to westbound SR 2 is closed.  Detour: SR 53; SR 163.  Project complete: June.  All work is weather permitting.

21. State Route 53: Safety Improvement Project

Ottawa County (468-14): Through May, intermittent single lane restrictions are possible on SR 53 between Wilcox Road and S. Wonnell Road for safety improvements. Project complete: June.  All work is weather permitting.

22. U.S. Route 6: Bridge Repair 

Sandusky (49-15): Through May, US 6, between CR 294 and TR 298, is closed for bridge repair.  Eastbound detour: SR 510; SR 412; SR101; SR 269.  Westbound detour: SR 269; SR 101; US 20.  Project complete: August. All work is weather permitting.

 23. State Route 12: Bridge Rehabilitation 

Sandusky and Seneca Counties (433-14): Through May, SR 12 over Wolf Creek between Seneca County Line Road and Sullivan Street in Bettsville will be closed for bridge rehabilitation. Detour: SR 635; US 6; SR 53.  Additional restrictions will be announced.  Project complete: August.  All work is weather permitted.

24. State Route 412: Culvert Repair 

Sandusky County (324-14):  Through June, SR 412 between US 20 and SR 510 is closed for culvert repair.  Detours: US 20; SR 510.  Additional restrictions will be announced. Project complete: July.  All work is weather permitted.

25.  State Route 18: Resurfacing

Seneca County (20-15): Through May, intermittent lane restrictions are possible on SR 18 between CR 32 and the Seneca/Sandusky county line. Traffic will be maintained by flaggers.  Project complete: June.  All work is weather permitted. 

26. State Route 67: Bridge Repair

Seneca County (21-15): Through May, SR 67 between South Township Road 17 and East Township Road 42, south of Melmore, is closed for bridge repair.  Detour: SR 231; US 224; SR 100. Project complete May.  All work is weather permitted.

Williams/Fulton/Henry Counties 

27. State Route 281: Culvert Replacement

Henry County (442-14): Through June, SR 281, between CR 10 and SR 109, is closed for culvert replacement.  Detour: SR 108; SR 18; SR 109.  All work is weather permitting.

28. County Road 424: Stone Arch Replacement
Henry County (607-12):
Through April, CR 424, between SR 109 and TR 6C, is closed for stone arch repair.  Detour: SR 295; US 24; SR 109.  Project complete: April.  All work is weather permitting.

District Wide  

29. Various Routes: Guardrail & Electrical Maintenance  

District Wide (1071-14 & 1076-14): Through December, intermittent lane restrictions are possible district wide for guardrail and electrical maintenance.  Project complete: December. All work is weather permitting.