ODOT District Two Weekly Construction Update – Nov. 19

Please pay attention to what you are doing at all times when you are driving! It’s not just about YOU! There are others on the roads who have loved ones to see and jobs to do. Don’t make for unnecessary delays or worse with your selfish desires (speed, talking or texting on the phone, having to make eye contact with a passenger and/or using your hands to talk instead of drive, eating, reaching, smoking, arguing, kissing…. you get the idea!) ~ JP Miklovic

ODOT District Two Weekly Construction Update – Nov. 19

Lucas/Wood Counties

1. Interstate 75: Widening
Wood & Hancock Counties (170-14, 199-14, 237-14 & 3000-14):

The below work will take place to switch traffic onto new pavement along I-75 from I-475 to US 6.  Work will take place overnight to minimize the impact to drivers.  Please be advised of changing traffic patterns.

Effective Thursday, November 19 at 11pm, through Friday, November 20 at 6am.  Shoulder and short-term lane restrictions are possible at the I-75/I-475 interchange in Perrysburg for barrier wall relocation and restriping. 

Effective Friday, November 20 at 11pm, through Saturday, November 21 at 4am, the ramp from eastbound I-475 to southbound I-75 will be closed for traffic pattern change.  Suggested alternate route:  northbound I-75; US 20 (Exit 193). 

Effective Friday, November 20 at 11pm, through Saturday, November 21 at 5am, the following ramps may be closed for traffic pattern change: 

·         The ramps to/from southbound I-75 to/from SR 582. 

·         The ramps to/from northbound I-75 to/from SR 64. 

·         The ramps to/from northbound I-75 to/from US 6.

Effective Saturday, November 21, southbound I-75 traffic, from the I-75/I-475 split in Perrysburg to SR 582, will be on the northbound pavement.  Additionally, at this time, northbound I-75 traffic, from US 6 to SR 582, will be on the southbound pavement.

*Motorists are advised of the changing traffic patterns in this work zone.*

Interstate Restrictions:

Through November 2016, overnight, from 7pm until 6am, single lane restrictions are possible on I-75 between the I-75/I-475 interchange in Perrysburg and CR 99 in Hancock County.  Through 2016, southbound I-75 is reduced to two lanes from US 20 to I-475 in Perrysburg. Through 2016, 11-foot lane width restrictions are in place on I-75 between US 20 in Perrysburg and CR 99 in Hancock County. 

Ramp Restrictions:

·         Through July 2016, 11-foot lane width restrictions are in place on the ramps from northbound and southbound I-75 to Cygnet Road (Exit 171) and from Cygnet Road to northbound and southbound I-75.

Local Routes:

Through February 2016, Bays Road at I-75 will be closed for bridge work.  Detour: SR 25; SR 281; Solether Road.

Through Monday, November 23, Jerry City Road at I-75 is closed for bridge work.  Detour: SR 25; SR 281; Solether Road.

Through December, Township Road 101 in Hancock County, between CR 220 and TR 142, is closed for bridge work over I-75.  Project complete: October 2017.  All work is weather permitting.

2. Interstate 75: Widening *UPDATE*
Lucas County (485-14, 536-14):
  Through July 2018, overnight, 7pm through 6am, single lane restrictions are possible on I-75, from I-475 in Toledo to I-280 for bridge work.  Through fall 2016, one lane of I-75 traffic is maintained in the current northbound lane and one lane of traffic is relocated to southbound I-75 and separated by barrier wall.

The following ramps are closed:

·         Through June 2016, the ramp from Phillips Avenue to northbound I-75.  Detour: Manhattan Boulevard; Lagrange Street; South Expressway Drive.

·         Through July 2016, the ramp from southbound I-75 to Phillips Avenue (Exit 206).  Detour: North Expressway Drive (Exit 207); Stickney Avenue; South Expressway Drive.

·         Through August 2016, the ramp from northbound I-75 to Jeep Parkway (Exit 205A).  Detour: Berdan Avenue (Exit 205B); Detroit Avenue.

·         Through October 2016, the ramp from northbound I-75 to Phillips Avenue (Exit 206).  Detour: south Expressway Drive (Exit 207); Stickney Avenue; North Expressway Drive.

·         Through July 2018, the ramp from Jeep Parkway to southbound I-75.  Detour: Berdan Avenue.

·         Through July 2018, the ramp from Willys Parkway to northbound I-75.  Detour: Berdan Avenue; Detroit Avenue; Phillips Avenue.

·         Through July 2018, the ramp from southbound I-75 to Willys Parkway (Exit 205A).  Detour: Detroit Avenue (Exit 203B).

Local Streets:

Lane restrictions on Lagrange Street at I-75 for bridge work are complete.

 

Through December, expect lane restrictions on Phillips Avenue at I-75 and Stickney Avenue at I-75 for bridge work.

Through May 2016, expect lane restrictions on Berdan Avenue at I-75 and Detroit Avenue at I-75 for bridge work.

Through June 2016, South Expressway Drive is restricted to a single lane between Stickney Avenue and Lagrange Street.

Through August 2016, Jeep Parkway from Central Avenue to Berdan Avenue is closed.  Central Avenue; Detroit Avenue; Berdan Avenue.

Through October 2016, the ramp from northbound I-75 to Berdan Avenue is restricted to right turn only movements.  Suggested alternate route: Berdan Avenue; Detroit Avenue; Phillips Avenue; Haverhill Drive.

Through November 2016, Elm Street and Wersell Avenue at South Expressway Drive, will be closed.

Through May 2017, the Polish Village Overpass is closed for bridge work.  Detour: North Expressway Drive; Stickney Avenue; South Expressway Drive.

Through July 2018, Willys Parkway from Pioneer Lane to Jeep Parkway is closed.

Project complete: September 2018.  All work is weather permitting.

3. Interstate 75: Pavement Rehabilitation
Lucas County (268-14):
Through August 2016, I-75, from the I-75/475 split in Toledo to the Anthony Wayne Trail, is reduced to two lanes.  Overnight, 10pm through 6am, single lane restrictions are possible in this work zone. 

•      The ramp from northbound I-75 to Bancroft Street is now open.

Through August 2016, the following ramps are restricted or closed:

·         The interchange ramp from eastbound I-475 to southbound I-75 is reduced to one lane.

·         The interchange ramp from northbound I-75 to westbound I-475 is reduced to one lane.

·         The ramp from D­etroit Avenue to southbound I-75 is closed.  Detour: Monroe Street; Michigan Avenue; SR 25.

·         The ramp from Detroit Avenue to northbound I-75 is closed.  Detour: Monroe Street; 14th Street.

Through May 2016, Oakwood Avenue, between Wells Street and Grove Place, is closed for bridge work.  Seek alternate route.  Project complete: August 2016.  All work is weather permitting.

4. Interstate 75: Rest Area Closure

Wood County (170-14)Through July 2016, the northbound and southbound I-75 rest areas are closed as part of the I-75 widening project.  Project complete: July 2016.  All work is weather permitting.

 

5. Interstate 475: ProMedica Parkway Ramp
Lucas County:
  Through 2016, the ramp from ProMedica Parkway to eastbound I-475 is closed for traffic control.  Detour: westbound I-475; Douglas Road.  All work is weather permitting.

6. Interstate 475/U.S. Route 23: Interchange Upgrade
Lucas County (184-14 & 210-15):
 Through December, the ramp from southbound US 23 to Central Avenue is closed.  Detour: southbound I-475/US23; Airport Highway (Exit 8A).  Additionally at this time, southbound US 23 traffic is reduced to one lane from the I-475/US 23 split in Sylvania to Central Avenue.  The ramp from westbound I-475 to Central Avenue (Exit 13) is open.

Overnight lane restrictions are possible at the interchange of I-475/US 23 from Central Avenue to N. Holland Sylvania Road.  Through October, lane restrictions are possible on Blossman Road, between Moffat Road and Plainview Drive for bridge work.  Traffic will be maintained by flaggers.  Project complete: December.  All work is weather permitting.

 

7. Interstate 475: Bridge Widening *ANGOLA ROAD IS OPEN*

Lucas County (251-13 & 235-14):  Angola Road at I-475 is now open.  Through May 2016, overnight from 8pm until 6am, lane restrictions are possible on I-475, between Angola Road and Salisbury Road/Dussel Drive.  11-foot lane width restrictions are in place on I-475, between Angola Road and Salisbury Road/Dussel Drive. Project complete: August 2016.  All work is weather permitting.  

8. Interstate 475: Noise Wall Installation

Lucas County (314-14):  Through November, intermittent shoulder restrictions are possible on I-475, between Corey Road and Woodley Road, for finish work.  Project complete: October.  All work is weather permitting.

9. Interstate Maintenance Work

Lucas and Wood Counties:  Through December, intermittent overnight lane restrictions are possible on I-75, I-280 and I-475 in Lucas and Wood counties for maintenance work.  Project complete: December.  All work is weather permitting.

10. U.S. Route 20: Central Avenue Interchange Project
Lucas County (210-15): 
Through September 2017, overnight from 9pm until 6am, lane restrictions are possible on I-475/US 23 between Dorr Street and the I-475/US 23 interchange.  11-foot lane width restrictions are in place within the work zone. Additional restrictions will be announced.  Project complete: September 2017.  All work is weather permitting. 

 

11. U.S. Route 20: Utility Work

Lucas County:  Through November, overnight from 9pm until 6am, lane restrictions are possible on Central Avenue, between I-475 and Central Park West, for gas line relocation.  For more information, contact Columbia Gas at 1-800-344-4077.  All work is weather permitting.

12. U.S. Route 20A: Eber Road Roundabout Project *UPDATE*
Lucas County (184-15):
  Through December, intermittent lane restrictions are possible on US 20A at Eber Road for finish work.  Project complete: December.  All work is weather permitting.

13. State Route 2: Anthony Wayne Bridge Project

Lucas County (58-13): All lanes of the Anthony Wayne Bridge are now open.  Through November, intermittent lane restrictions are possible and there is no pedestrian access for finish work.  Project complete: May 2016.  All work is weather permitting.

14. State Route 25: Safety Project
Lucas County (299-15):
  Through September 2016, southbound (outbound from downtown Toledo)Anthony Wayne Trail, between Hippo Way and City Park Boulevard, will remain reduced two lanes of traffic for pavement rehabilitation.  Project complete: November 2016.  All work is weather permitting.

 

15. McCord Road: Underpass Construction
Lucas County (236-14): 
Through September 2016, McCord Road between North Mall Drive/Hall Road and Spectrum Drive is closed to vehicular and pedestrian traffic.  Detour: Holland Park Boulevard; North Mall Drive.  Project complete: November 2016.  All work is weather permitting.

16. U.S. Route 6: Pavement Reconstruction and Bridge Work
Wood County (170-14):
  Through June 2016, the ramp from southbound I-75 to eastbound US 6 is closed.  Detour: westbound US 6; SR 25.  Through June 2016, US 6, between SR 25 and Dunbridge road, is reduced to one lane in each direction.  Lane widths are restricted to 11ft in this work zone.  Work complete: June 2016.  All work is weather permitting.

17. State Route 64: Slide Repair
Wood County (155-15):
  Through November, intermittent lane restrictions are possible on SR 64, between Reitz Road and SR 64/65 Waterville Bridge, for slide repair.  Project complete: November.  All work is weather permitting.

18. State Route 582: Bridge Rehabilitation
Wood County (154-15):  
SR 582, between Stony Ridge Road and Laymen Road is now open.  Through November, intermittent lane closures are possible on SR 582, between Stony Ridge Road and Layman Road, for finish work.  Traffic will be maintained by flaggers.  Project complete: November.  All work is weather permitting. 

19. Tracy Road: Bridge Replacement *PROJECT COMPLETE*

Wood County (3040-15):  Tracy Road, between Welling Road and Latcha Road, is open.  The bridge replacement project is complete.

20. Five Point Road: Bridge Replacement  

Wood County (3040-15):  Through November, Five Point Road, between SR 199 and Thompson Road, is closed for bridge replacement.  Detour: SR 199; Dowling Road; Lime City Road.  Project complete: December.  All work is weather permitting.

21. Buck Road: Bridge Work

Wood County:  Through Sunday, November 22, overnight from 9pm until 5am, Buck Road over I-75, will be closed for bridge work.  Suggested alternate route: northbound I-75; Wales Road (Exit 198); southbound I-75.  Additionally at these times, left turns from I-75 to Buck Road (Exit 197) are prohibited.  Northbound I-75 to westbound Buck Road detour: Wales Road (Exit 198); southbound I-75.  Southbound I-75 to eastbound Buck Road detour: SR 795 (Exit 195A); northbound I-75.  All work is weather permitting.

 

Ottawa/Sandusky/Seneca Counties

 

22. State Route 2: Lightner Road Bridge Widening

Ottawa County (232-15):  Through August 2016, intermittent lane restrictions are possible on SR 2, between SR 53/SE Catawba Road and SR 269, for bridge work.  Additionally, Lightner Road, between Kirk Road and East State Road, may be reduced to one lane for temporary pavement construction.  Traffic will be maintained by flaggers.  Additional restrictions will be announced.  Project complete: September 2016.  All work is weather permitting.

23. State Route 163: Culvert Replacement *ROAD OPEN*

Ottawa County:  SR 163, between Lightner Road and SR 269, is open.  The culvert replacement work is complete.


24. U.S. Route 6: Roundabout Construction
Sandusky County (8018-15
):  Through November, a temporary traffic signal is used to maintain one lane of traffic on US 6/SR 53, between Napoleon Road and Muskellunge Creek Road.  Through November, Muskellunge Creek Road, between Spieldenner Road and Gerwin Road, is closed.  Project complete: November.  All work is weather permitting.

25. State Route 19: Railroad repair *WORK COMPLETE*

Sandusky County:  SR 19, between East Cole Road and North Coast Inland Trail, is open.  The railroad repair work is complete.

Williams/Fulton/Henry Counties

26. County Road 49/County Road 16: Bridge Replacement

Williams County (3036-15):  Through November, intermittent lane restrictions are possible on CR 49/CR16, between CR I50 and CR J, for finish work.  Project complete: November.  All work is weather permitting.

27. State Route 18: Culvert Replacement *WORK COMPLETE*

Henry County:  SR 18, between CR 10 and CR 11, is now open.  The culvert replacement work is complete.

28. State Route 109: Damascus Bridge: Bridge Replacement

Henry County (1-15):  Through October 2017, motorists should watch for additional truck traffic near SR 109 at the Damascus bridge for bridge work.  Work impacting traffic will be announced.  Project complete: October 2017.  All work is weather permitting.

District Wide 

                                                                                                                                                      

29. Various Routes: Guardrail & Electrical Maintenance

District Wide (1071-14 & 1076-14):  Through December, intermittent lane restrictions are possible district wide for guardrail and electrical maintenance.  Project complete: December.  All work is weather permitting.

Resize
Size Update
Sept. 2023
Sept. 2023
Logo & Info Aug 2023
June 2023 Left Rail
Temporary
Breast Cancer Treatment Rail Ad
OB You’re Expecting
Logo
Briar Hill Health Update
Ol’ Jenny

Leave a Reply

Your email address will not be published. Required fields are marked *

NBX powered by PANDA Technologies
NBLS Website