ODOT District Two Weekly Construction Update – Oct 10

DOT d 2 Construction Update Oct. 10
ODOT District Two Weekly Construction Update

Updates are highlighted in bold and underlined.
Lucas/Wood Counties
1. Interstate 75: Widening *RAMP CLOSURES FRIDAY NIGHT INTO SATURDAY* Wood & Hancock Counties (170-14, 199-14, 237-14 & 3000-14):
Interstate Restrictions:
Effective Friday, October 9 at 11pm, through Saturday, October 10 at 3am the ramp from eastbound I-475 to northbound I-75 will be closed for barrier wall relocation. Detour: Southbound I-75; SR 582 (Exit 187). Effective Saturday, October 10, from 12:30am to 5am, the ramp from northbound I-75 to westbound I-475 will be closed for barrier wall relocation. Detour: SR 795 (Exit 195); I-75. Motorists are advised of changing traffic patterns in this work zone.
Through October, northbound I-75 in Perrysburg, between the ramp from northbound I-75 to westbound I-475 (Exit 192) and the ramp from eastbound I-475 to northbound I-75, is reduced to one lane for pavement work. Motorists should be aware of traffic pattern changes in this area.
Through November, overnight, from 7pm until 6am, single lane restrictions are possible on I-75 between the I-75/I-475 interchange in Perrysburg and CR 99 in Hancock County. Through 2016, southbound I-75 is reduced to two lanes from US 20 to I-475 in Perrysburg. Through 2016, 11-foot lane width restrictions are in place on I-75 between US 20 in Perrysburg and CR 99 in Hancock County.
Ramp Restrictions:
 Through December, the ramp from southbound I-75 to westbound I-475 is reduced to one lane.
 Through July 2016, 11-foot lane width restrictions are in place on the ramps from northbound and southbound I-75 to Cygnet Road (Exit 171) and from Cygnet Road to northbound and southbound I-75.
Local Routes:
Effective Monday, October 19, through February 2016, Bays Road at I-75 will be closed for bridge work. Detour: SR 25; SR 281; Solether Road.
Through November, Jerry City Road at I-75 is closed for bridge work. Detour: SR 25; SR 281; Solether Road.
Through December, Township Road 101 in Hancock County, between CR 220 and TR 142, is closed for bridge work over I-75. Project complete: October 2017. All work is weather permitting.
2. Interstate 75: Widening *UPDATE* Lucas County (485-14, 536-14): Effective Monday, October 12 through, Thursday, October 15, overnight from 9pm until 6am, I-75, from I-280 to I-475, may be reduced to one lane for pavement repair. Additionally, at this time, intermittent ramp closures are possible.
Effective Thursday, October 15, from 1am through Friday, October 16, 6:30am, Lagrange Street at I-75 will be closed for bridge work. Detour: Detroit Avenue; Phillips Avenue; Manhattan Boulevard.
Through July 2018, overnight, 7pm through 6am, single lane restrictions are possible on I-75, from I-475 in Toledo to I-280 for bridge work. Through fall 2016, one lane of I-75 traffic is maintained in the current northbound lane and one lane of traffic is relocated to southbound I-75 and separated by barrier wall.
The following ramps are closed:
 Through June 2016, the ramp from Phillips Avenue to northbound I-75. Detour: Manhattan Boulevard; Lagrange Street; South Expressway Drive.
 Through July 2016, the ramp from southbound I-75 to Phillips Avenue (Exit 206). Detour: North Expressway Drive (Exit 207); Stickney Avenue; South Expressway Drive.
 Through August 2016, the ramp from northbound I-75 to Jeep Parkway (Exit 205A). Detour: Berdan Avenue (Exit 205B); Detroit Avenue.
 Through October 2016, the ramp from northbound I-75 to Phillips Avenue (Exit 206). Detour: south Expressway Drive (Exit 207); Stickney Avenue; North Expressway Drive.
 Through July 2018, the ramp from Jeep Parkway to southbound I-75. Detour: Berdan Avenue.
 Through July 2018, the ramp from Willys Parkway to northbound I-75. Detour: Berdan Avenue; Detroit Avenue; Phillips Avenue.
 Through July 2018, the ramp from southbound I-75 to Willys Parkway (Exit 205A). Detour: Detroit Avenue (Exit 203B).
Local Streets:
Through October, South Expressway Drive is restricted to a single lane between Stickney Avenue and Lagrange Street.
Through November, expect lane restrictions on Phillips Avenue at I-75, Lagrange Street at I-75, Berdan Avenue at I-75, Detroit Avenue at I-75, and Stickney Avenue at I-75 for bridge work.
Through August 2016, Jeep Parkway from Central Avenue to Berdan Avenue is closed. Central Avenue; Detroit Avenue; Berdan Avenue.
Through October 2016, the ramp from northbound I-75 to Berdan Avenue is restricted to right turn only movements. Suggested alternate route: Berdan Avenue; Detroit Avenue; Phillips Avenue; Haverhill Drive.
Through May 2017, the Polish Village Overpass is closed for bridge work. Detour: North Expressway Drive; Stickney Avenue; South Expressway Drive.
Through July 2018, Willys Parkway from Pioneer Lane to Jeep Parkway is closed.
Project complete: September 2018. All work is weather permitting.
3. Interstate 75: Pavement Rehabilitation Lucas County (268-14): Through August 2016, I-75, from the I-75/475 split in Toledo to the Anthony Wayne Trail, is reduced to two lanes. Overnight, 10pm through 6am, single lane restrictions are possible in this work zone.
Ramp closures:
• Through October, the ramp from Lawrence Avenue to southbound I-75 will be closed for pavement installation. Detour: Monroe Street; Michigan Street.
• Through October, the ramp from northbound I-75 to Bancroft Street is closed. Detour: Berdan Ave (Exit 205B); Detroit Avenue.
• Through October, the ramp from Collingwood Boulevard to northbound I-75 is closed. Detour: Dorr Street; Washington Street; 14th Street.
• Through November, the ramp from southbound I-75 to Collingwood Boulevard will be closed for pavement installation. Detour: Washington Street (Exit 202A); Dorr Street.
Through August 2016, the following ramps are restricted or closed:
 The interchange ramp from eastbound I-475 to southbound I-75 is reduced to one lane.
 The interchange ramp from northbound I-75 to westbound I-475 is reduced to one lane.
 The ramp from Detroit Avenue to southbound I-75 is closed. Detour: Monroe Street; Michigan Avenue; SR 25.
 The ramp from Detroit Avenue to northbound I-75 is closed. Detour: Monroe Street; 14th Street.
Through May 2016, Oakwood Avenue, between Wells Street and Grove Place, is closed for bridge work. Seek alternate route. Project complete: August 2016. All work is weather permitting.
4. Interstate 75: Rest Area Closure
Wood County (170-14): Through July 2016, the northbound and southbound I-75 rest areas are closed as part of the I-75 widening project. Project complete: July 2016. All work is weather permitting.
5. Interstate 475: ProMedica Parkway Ramp Lucas County: Through 2016, the ramp from ProMedica Parkway to eastbound I-475 is closed for traffic control. Detour: westbound I-475; Douglas Road. All work is weather permitting.
6. Interstate 475/U.S. Route 23: Interchange Upgrade Lucas County (184-14 & 210-15): Through December, the ramp from southbound US 23 to Central Avenue is closed. Detour: southbound I-475/US23; Airport Highway (Exit 8A). Additionally at this
time, southbound US 23 traffic is reduced to one lane from the I-475/US 23 split in Sylvania to Central Avenue. The ramp from westbound I-475 to Central Avenue (Exit 13) is open.
Overnight lane restrictions are possible at the interchange of I-475/US 23 from Central Avenue to N. Holland Sylvania Road. Through October, lane restrictions are possible on Blossman Road, between Moffat Road and Plainview Drive for bridge work. Traffic will be maintained by flaggers. Project complete: December. All work is weather permitting.
7. Interstate 475: Bridge Widening Lucas County (251-13 & 235-14): Through December, Angola Road at I-475 is closed for bridge replacement. Detour: Holland Park Boulevard; North Mall Drive; McCord Road; Airport Highway; Holland Sylvania Road. Through October, the ramp from westbound Airport Highway to northbound I-475 is closed. Detour: southbound I-475; Salisbury Road/Dussel Drive (Exit 6).
Through May 2016, overnight from 8pm until 6am, lane restrictions are possible on I-475, between Angola Road and Salisbury Road/Dussel Drive. 11-foot lane width restrictions are in place on I-475, between Angola Road and Salisbury Road/Dussel Drive. Project complete: August 2016. All work is weather permitting.
8. Interstate 475: Noise Wall Installation
Lucas County (314-14): Through October, intermittent shoulder and lane restrictions are possible on I-475, between Corey Road and Woodley Road, for finish work. Project complete: October. All work is weather permitting.
9. Interstate 475: Pavement Work
Wood County: Through October, overnight from 7pm to 6am, single lane restrictions are possible on I-475 in both directions between SR 25 and US 24 for pavement work. All ramps will remain open. All work is weather permitting.
10. Interstate Maintenance Work
Lucas and Wood Counties: Through Friday, October 9, nightly from 9pm to 6am, I-475, between the I-475/US 23 split and Monroe Street, may be reduced to one lane for pavement repair. All ramps will remain open. Through December, intermittent overnight lane restrictions are possible on I-75, I-280 and I-475 in Lucas and Wood counties for maintenance work. Project complete: December. All work is weather permitting.
11. U.S. Route 20: Central Avenue Interchange Project Lucas County (210-15): Through September 2017, overnight from 9pm until 6am, lane restrictions are possible on I-475/US 23 between Dorr Street and the I-475/US 23 interchange. 11-foot lane width restrictions are in place within the work zone. Additional restrictions will be announced. Project complete: September 2017. All work is weather permitting.
12. U.S. Route 20: Utility Work
Lucas County: Through October, overnight from 9pm until 6am, lane restrictions are possible on Central Avenue, between I-475 and Central Park West, for gas line relocation. For more information, contact Columbia Gas at 1-800-344-4077. All work is weather permitting.
13. U.S. Route 20A: Eber Road Roundabout Project Lucas County (184-15): Through November, US 20A at Eber Road will be closed for roundabout installation. Detour: Airport Highway (SR 2); Crissey Road. Project complete: November. All work is weather permitting.
14. State Route 2: Anthony Wayne Bridge Project *BRIDGE TO OPEN NEXT WEEK*
Lucas County (58-13): Through Friday, October 16, the Anthony Wayne Bridge is closed to vehicular and pedestrian traffic. Detour: Oak Street; Fassett Street; Miami Street; I-75; Anthony Wayne Trail (Exit 201B); Monroe Street; Summit Street. Effective, Friday, October 16, through November, the Anthony Wayne bridge will be reduced to one lane in both directions for finish work. Through November, intermittent lane restrictions are possible on Yondota Street, Utah Street, Morris Street, Miami Street, and Ottawa Street for bridge work. Project complete: December. All work is weather permitting.
15. State Route 25: Safety Project Lucas County (299-15): Through November 2016, the Anthony Wayne Trail, between Hippo Way and City Park Boulevard, is reduced to two lanes for intersection safety improvements and pavement replacement. Project complete: November 2016. All work is weather permitting.
16. State Route 64: Roundabout and Realignment Lucas County (143-15): Through October, intermittent lane restrictions are possible on SR 64 at Finzel Road for finish work. Project complete: October. All work is weather permitting.
17. McCord Road: Underpass Construction *UPDATE* Lucas County (236-14): Effective Saturday, October 17, from 7am until 7pm, the Spectrum Drive and the roundabout at North Mall Drive/Hall Road and McCord Road will be closed for pavement repair. Detour: Airport Highway/SR 2; Holland Sylvania Road; Hill Avenue. Through September 2016, McCord Road between North Mall Drive/Hall Road and Spectrum Drive is closed to vehicular and pedestrian traffic. Detour: Holland Park Boulevard; North Mall Drive. Project complete: November 2016. All work is weather permitting.
18. U.S. Route 6: Pavement Reconstruction and Bridge Work Wood County (170-14): Through June 2016, the ramp from southbound I-75 to eastbound US 6 is closed. Detour: westbound US 6; SR 25. Through June 2016, US 6, between SR 25 and Dunbridge road, is reduced to one lane in each direction. Lane widths are restricted to 11ft in this work zone. Work complete: June 2016. All work is weather permitting.
19. State Route 64: Slide Repair Wood County (155-15): Through October, intermittent lane restrictions are possible within this work zone for slide repair. Project complete: November. All work is weather permitting.
20. State Route 105: Resurfacing
Wood County (99-15): Through October, intermittent lane restrictions are possible on SR 105, between Pemberville Road and US 23, for finish work. Traffic will be maintained by flaggers. Project complete: October. All work is weather permitting.
21. State Route 235: Resurfacing
Wood County (441-15): Through November, SR 235, between Willow Road and Old Coach Road, will be closed for resurfacing. Detour: US 6; SR 65. Project Complete: November. All work is weather permitting.
22. State Route 420: Safety Improvements
Wood County (423-14): Through October, short-term, intermittent lane restrictions are possible on southbound I-280, between SR 795 and SR 163, and on SR 420, between SR 163 and I-80/I-90, for finish work. Project complete: October. All work is weather permitting.
23. State Route 582: Bridge Rehabilitation
Wood County (154-15): Through October, SR 582, between Stony Ridge Road and Layman Road is closed for bridge rehabilitation. Detour: SR 199; SR 105; US 23. Project complete: October. All work is weather permitting.
24. Jerry City Road: Bridge Replacement *UPDATE*
Wood County (3028-15): Jerry City Road, between Rudolph Road and Mitchell Road, is open. Through October, Jerry City Road, between Wingston Road and Potter Road, is closed for bridge replacement. Detour: Wingston Road; Cygnet Road; Potter Road. Project complete: November. All work is weather permitting.
25. Tracy Road: Bridge Replacement
Wood County (3040-15): Through November, Tracy Road, between Welling Road and Latcha Road, is closed for bridge replacement. Detour: Latcha Road; Oregon Road; US 20. Project complete: November. All work is weather permitting.
26. Caris Road: Culvert Replacement Wood County (312-15): Through October, Caris Road, between SR 582 and Devils Hole Road, is closed for culvert replacement. Detour: SR 582; Laymen Road; Devils Hole Road. Additionally at this time, intermittent lane restrictions are possible on SR 582 at Caris Road. Traffic will be maintained by flaggers. Project complete: October. All work is weather permitting.
27. Five Point Road: Bridge Replacement
Wood County (3040-15): Through November, Five Point Road, between SR 199 and Thompson Road, will be closed for bridge replacement. Detour: SR 199; Dowling Road; Lime City Road. Project complete: December. All work is weather permitting.
Ottawa/Sandusky/Seneca Counties
28. State Route 2: Lightner Road Bridge Widening
Ottawa County (232-15): Through August 2016, intermittent lane restrictions are possible on SR 2, between SR 53/SE Catawba Road and SR 269, for bridge work. Additionally, Lightner Road, between Kirk Road and East State Road, may be reduced to one lane for temporary pavement construction. Traffic will be maintained by flaggers. Additional restrictions will be announced. Project complete: September 2016. All work is weather permitting.
29. State Route 163: Culvert Replacement *CLOSURE BEGINS TUESDAY*
Ottawa County: Effective Tuesday, October 13, through Friday, October 23, SR 163, between Behlman Road and Leutz Road, will be closed for culvert replacement. Detour: SR 19; SR 2; SR 358. Effective Monday, October 19, through October, SR 163, between Lightner Road and SR 269, will be closed for culvert replacement. Detour: SR 53; SR 2; SR 269 (Exit 125A). All work is weather permitting.
30. U.S. Route 6: Roundabout Construction Sandusky County (8018-15): Through October, a temporary traffic signal is used to maintain one lane of traffic on US 6/SR 53, between Napoleon Road and Muskellunge Creek Road. Through October, Muskellunge Creek Road, between Spieldenner Road and Gerwin Road, is closed. Project complete: November. All work is weather permitting.
31. State Route 412: Culvert Replacement *WORK COMPLETE* Sandusky County: SR 412, between Rockwell Road/TR 310 and SR 101, is open. The culvert replacement work is complete.
32. State Route 510: Culvert Replacement *WORK COMPLETE*
Sandusky County: SR 510, between US 6 and SR 412, is open. The culvert replacement work is complete.
33. State Route 19: Culvert Replacement
Seneca County (237-15): Through October, lane restrictions are possible on SR 19, between US 224 and CR 58/Crawford Seneca County Line Road, for resurfacing. Traffic will be maintained by flaggers. Project complete: October. All work is weather permitting.
Williams/Fulton/Henry Counties
34. State Route 107: Bridge Rehabilitation Williams County (153-15): Through October, intermittent lane restrictions are possible on SR 107, between CR 8 and CR 9 for finish work. Traffic will be maintained by flaggers. Project complete: October. All work is weather permitting.
35. County Road 49/County Road 16: Bridge Replacement
Williams County (3036-15): Through October, CR 49/CR 16, between CR I50 and CR J, will be closed for bridge replacement. Detour: CR J; SR 15; CR G. Project complete: November. All work is weather permitting.
36. State Route 120: Culvert Replacement *UPDATE*
Fulton County: Through Saturday, October 10, SR 120, between CR 15-1 and CR 14-2, will be closed for culvert replacement. Detour: Michigan SR 156; SR 108; US 20; SR 109. The culvert replacement on SR 120, between SR 109 and CR 7, has been postponed until spring 2016. All work is weather permitting.
37. State Route 109: Damascus Bridge: Bridge Replacement
Henry County (1-15): Through October 2017, motorists should watch for additional truck traffic near SR 109 at the Damascus bridge for bridge work. Work impacting traffic will be announced. Project complete: October 2017. All work is weather permitting.
District Wide
38. Various Routes: Guardrail & Electrical Maintenance
District Wide (1071-14 & 1076-14): Through December, intermittent lane restrictions are possible district wide for guardrail and electrical maintenance. Project complete: December. All work is weather permitting.
###
For more information contact: The District Two Public Information Office at (419) 373-4428 or email [email protected]