North Baltimore, Ohio

May 21, 2024 3:15 pm

Need A Chiropractor
TOP update from image Dec 2023
The District Update – Water Shed
Logo
Sept. 2023
Sept. 2023
June 2023 Left Rail
Resize
Ol’ Jenny
OB You’re Expecting
Size Update
Logo & Info Aug 2023
Fiber Locator
Temporary

ODOT Update – U.S. Route 6 in Wood County

U.S. Route 6 in Wood County

BOWLING GREEN (Friday, July 31, 2015) – The Ohio Department of Transportation (ODOT) District Two announces the following update to the U.S. Route 6 resurfacing and bridge work in Wood County.  Updates are highlighted in bold and underlined:

U.S. Route 6:  Resurfacing and Bridge Work
Wood County (434-14):  The ramp from SR 25 to eastbound US 6 is now open.  The bridge repair is complete.  Through August, intermittent lane restrictions are possible on US 6, between County Home Road and SR 199 for resurfacing.  Traffic is maintained by flaggers.  Through August, US 6, between Rudolph Road and Klopfenstein Road is reduced to one lane in each direction for bridge repair.  Project complete: September.  All work is weather permitting.

U.S. Route 6: Pavement Reconstruction and Bridge Work
Wood County (170-14):
  Through October, the ramp from southbound I-75 to eastbound US 6 is closed. Detour: westbound US 6; SR 25.  Through October, US 6, between SR 25 and Dunbridge road, is reduced to one lane in each direction.  Lane widths are restricted to 11ft in this work zone.  Work complete: October.  All work is weather permitting.

Resize
Size Update
Sept. 2023
Sept. 2023
Logo & Info Aug 2023
June 2023 Left Rail
Temporary
Breast Cancer Treatment Rail Ad
Fiber Locator
OB You’re Expecting
Logo
Briar Hill Health Update
Ol’ Jenny

Leave a Reply

Your email address will not be published. Required fields are marked *

NBX powered by PANDA Technologies
NBLS Website