North Baltimore’s FREE & LOCAL source for online news, sports, information and inspiration!

NBLS Website
Weekly Specials
Oct. 2018 Update
Aug 18 2018 – Auto Loan
Best 1st Job – Anytime Breakfast
April 29 Rail
Internet Iceberg – Cable Shark
Stormy Weather
Nov 2018
March 25

ODOT Weekly Construction Update

ODOT Weekly Construction Update: Lucas County

For Immediate Release
Thursday, August 31, 2017

 Updates are highlighted in bold and underlined.

I 75

Interstate 75: Widening *UPDATE*
 Lucas County (485-14, 536-14): Through September 2018, overnight, 7pm through 6am, single lane restrictions are possible on I-75, from I-475 in Toledo to I-280 for widening and bridge work.

The ramp from southbound I-75 to southbound I-280 (Exit 208), is a right hand exit. *Motorists are advised of new traffic pattern*

Through September, southbound I-75, between Ottawa River Road and I-280, is reduced to two lanes for pavement installation.

Effective Sunday, September 10 at pm, through Monday, September 11 at 6am, single lane restrictions are possible on northbound I-75, between Lagrange Street and I-280, pavement work.

 

Effective Monday, September 11 through Thursday, September 14, nightly 10pm until 6am, single lane restrictions are possible on northbound I-75, between Lagrange Street and I-280, for pavement work.

The following ramps are restricted/closed:

·         Effective Friday, September 8 at 10pm, through Monday, September 11 at 6am, the ramp from northbound I-280 to southbound I-75, will be closed for pavement work. Detour: northbound I-75; Alexis Road (Exit 210); southbound I-75.

·         Through July 2018, the ramp from Phillips Avenue to southbound I-75 is closed.  Detour: northbound I-75; Stickney Avenue (Exit 207); North Expressway Drive; southbound I-75.

·         Through July 2018, the ramp from Jeep/Willys Parkway to southbound I-75 is closed.  Detour: Detroit Avenue.

·         Through July 2018, the ramp from Jeep/Willys Parkway to northbound I-75 is closed.  Detour: Berdan Avenue; Detroit Avenue; Phillips Avenue.

·         Through July 2018, the ramp from southbound I-75 to Jeep/Willys Parkway (Exit 205A) is closed.  Detour: Detroit Avenue (Exit 203B).

·         Through September 2018, the interchange ramp from eastbound I-475 to southbound I-75 is reduced to one lane.

Local Streets:

Through mid-September, South Expressway Drive is restricted to a single lane between Stickney Avenue and Lagrange Street.

Through mid-September, Elm Street and Wersell Avenue at South Expressway Drive, are closed.

Through mid-September, northbound Detroit Avenue under I-75 will be reduced to one lane for bridge work.

Through mid-October, Berdan Avenue, between Jeep Parkway and Detroit Avenue, will be closed for pavement reconstruction. Detour: Detroit Avenue; Phillips Avenue; Haverhill Drive.

Through October, expect lane restrictions on Phillips Avenue at I-75 for bridge work.

Through July 2018, Pioneer Lane at SR 120/Central Avenue, will be closed. Detour: Willys Parkway; Berdan Avenue; Jeep Parkway; Central Avenue.

Through July 2018, lane restrictions are possible on Detroit Avenue at I-75 for bridge work.

Through July 2018, expect lane restrictions on Berdan Avenue at I-75 for bridge work.

Through July 2018, Willys Parkway from Pioneer Lane to Jeep Parkway is closed.

Project complete: September 2018.  All work is weather permitting.

I 75

Interstate 75: Noise Wall Repair *UPDATE*
Lucas County (520-16): Through September, shoulder and single lane restrictions are possible on I-75, between I-280 and the Ohio/Michigan state line, for noise wall repair and sign installation.  Project complete:  September. All work is weather permitting.

I 75

Interstate 75: Slide Repair
Lucas County (171-17): Through September, shoulder restrictions are possible on northbound I-75, between I-280 and Ottawa River Road, for slide repair. Additional restrictions may be announced. Project complete: October. All work is weather permitting.

I 475

Interstate 475: ProMedica Parkway Ramp
Lucas County:  The ramp from ProMedica Parkway to eastbound I-475 is open to access southbound I-75 only. Through September 2018, the ramp from ProMedica Parkway to eastbound I-475 to access northbound I-75 is closed.  Detour: southbound I-75; Detroit Avenue (Exit 203B); northbound I-75.  All work is weather permitting.

I 475

Interstate 475: Resurfacing *UPDATE*
Lucas County (497-16): Through September, nightly from 9pm until 7am, lane restrictions are possible on I-475, between Monclova Road and Central Avenue, for resurfacing.  Additional lane and ramp restrictions may be announced.  Project complete: September.  All work is weather permitting.

I 475

Interstate 475: Utility Work *UPDATE*
Lucas County: 
Through September, shoulder restrictions are possible on northbound I-475, between SR 65 and US 24, for utility work. All work is weather permitting.

I 475

Interstate Maintenance Work
Lucas and Wood Counties: 
Through December, intermittent overnight lane restrictions are possible on I-75, I-280 and I-475 in Lucas and Wood counties for maintenance work.  Project complete: December.  All work is weather permitting.

us route 20

U.S. Route 20: Central Avenue Interchange Project
Lucas County (210-15): 
Through September, Central Avenue, between McCord Road and Van Fleet Parkway, may be reduced to one lane for finish work. Through September, lane restrictions are possible on I-475/US 23, between Dorr Street and N. Holland Sylvania Road.  Project complete: September.  All work is weather permitting.

US 23

U.S Route 23: Bridge Rehabilitation
Lucas County (248-17): Through September, shoulder restrictions are possible on northbound US 23, between Holland Sylvania Road and Monroe Street, for bridge rehabilitation. Through September, nightly from 8pm until 6am, shoulder and lane restrictions are possible on northbound US 23, between Holland Sylvania Road and Monroe Street, for bridge rehabilitation.

Effective Sunday, September 10 at 8pm, through Wednesday, September 13 at 6am, northbound US 23, between Holland Sylvania Road and Monroe Street, will be reduced to one lane for bridge repair.

Project complete: October. All work is weather permitting.

US 23

U.S. Route 23: Crack sealing *RESTRICTIONS AND CLOSURES BEGIN TUESDAY*
Lucas County: Effective Tuesday, September 5 through Thursday, September 7, nightly from 9pm until 6am, US 23, between Blossman Road and the Ohio/Michigan Line, may be reduced to one lane for crack sealing. Additionally at this time, the ramps from US 23 to Monroe Street (Exit 234), may be closed for crack sealing. Seek alternate route.

State Route 2

State Route 2: Anthony Wayne Bridge Painting Project
Lucas County (220-16): 
Through November, SR 2, between Oak Street and Broadway Street, is reduced to one lane in each direction for bridge painting. Additional local road closures may be announced. Project complete: November.  All work is weather permitting.

State Route 2

State Route 2: Resurfacing
Lucas County (325-17): Through October, lane restrictions are possible on SR 2/Airport Highway, between Holloway Road and I-475, for resurfacing. Project Complete: November. All work is weather permitting.

State Route 51

State Route 51: Bridge Rehabilitation Project *CLOSURE BEGINS WEDNESDAY*
Lucas County (550-16): Through September, lane restrictions are possible on I-75, between Detroit Avenue (Exit 203B) and Collingwood Boulevard (Exit 202B), for bridge work. Through September, Monroe Street/SR 51 over I-75 will be reduced to one lane in each direction for bridge work. Through September, access to/from Monroe Street to/from Glenwood Avenue, to/from Maplewood Avenue, to/from Lawrence Avenue north of Monroe Street, and eastbound Monroe Street to Lawrence Avenue south of Monroe Street, and is maintained through right turn movements only. Effective Wednesday, September 6 through Friday, September 8, Lawrence Avenue at Monroe Street, may be closed for paving. Additionally at this time, northbound Lawrence Avenue, between Woodruff Avenue and Monroe Street, is closed.  Project complete: October. All work is weather permitting.

State Route 51

State Route 51/Monroe Street: Bridge Redecking
Lucas County (289-16): Through October, nightly from 7pm through 6am, lane restrictions are possible on I-475, between Secor Road and Douglas Road, for bridge work. Monroe Street over I-475, is now open. Through September, lane restrictions are possible on Monroe Street over I-475, for bridge work.  Project complete: June 2018.  All work is weather permitting.

state route 64

State Route 64: Resurfacing and Bridge Repair
Lucas County (290-17
): Through October, lane restrictions are possible on SR 64, between US 24 and SR 64 North, for resurfacing.  Traffic will be maintained by flaggers. Project complete: November. All work is weather permitting.

state route 65

State Route 65: Connector Street *UPDATE*
Wood and Lucas Counties (419-17): Through October, lane restrictions are possible on eastbound SR 65/Miami Street, between Hollywood Boulevard and I-75, for intersection work.Additional restrictions will be announced. Project complete: November. All work is weather permitting.

state route 120

State Route 120: Resurfacing
Lucas County: (325-17): Through October, lane restrictions are possible on SR 120, between Holland Sylvania Road and Secor Road. Project complete: December. All work is weather permitting.

state route 295

State Route 295: Resurfacing and Bridge Repair *UPDATE*
Lucas County (622-16
): Through September, lane restrictions are possible on SR 295, between South River Road and SR 64, for finish work. Traffic will be maintained by flaggers.  Project complete: November. All work is weather permitting.

state route 295

State Route 295: Bridge Rehabilitation
Wood and Lucas Counties (8004-17): SR 295, between South River Road and Front Street over the Maumee River, is now open. Through September, lane restrictions are possible for finish work. Project complete: September. All work is weather permitting.

Indiana Avenue: Bridge Replacement
Lucas County (8010-17): Through May 2019, nightly from 7pm until 6am, lane restrictions are possible on I-75, between Dorr Street and Nebraska Avenue, for bridge replacement. Additionally at this time, the ramp from southbound I-75 to Washington Street/Downtown (Exit 202A), will be reduced to one lane for bridge replacement.

Through Friday, September 1, nightly from 10pm until 6am, the ramp from southbound I-75 to Washington Street/Downtown (Exit 202A), will be closed for pavement work. Alternate route: Collingwood Boulevard (Exit 202B); Door Street. Additionally at this time, Indiana Avenue, between Division Street and Washington Street, will be closed for pavement work. Detour: Collingwood Boulevard; Dorr Street.

Through July 2018, Indiana Avenue, between Division Street and Washington Street, over I-75, will be reduced to one lane for bridge replacement. Local and pedestrian access will be maintained.

Project complete: June 2019. All work is weather permitting.

Bowen Road: Bridge Redecking
Lucas County (289-16): Through mid-September, Bowen road, between Groveland Road and Langenderfer Drive, will be closed for bridge painting. Detour: Groverland Road; Rushland Avenue. Project complete: June 2018. All work is weather permitting.

Various Routes: Guardrail, Striping & Electrical Maintenance
District Wide (1076-16 & 1069-16 & 1065-16): Through December, intermittent lane restrictions are possible district wide for guardrail, striping and electrical maintenance.  Project complete: December.  All work is weather permitting.

Leave a comment or information HERE - Must include FIRST & LAST NAME!

CONTACT NBX:
419.581.9629 (leave message)
Available ONLINE 24/7/365
NBX powered by PANDA Technologies
Lynn – Rose Slider
T and J Jan 2016
February 2017
October 2018 Rail
Logo Panel April 2017
Gerdeman Ins Jan 2016
Kelley Jan 2016
NBXpress Archives
  • 2018 (1852)
  • 2017 (2183)
  • 2016 (2101)
  • 2015 (2131)
  • 2014 (384)