North Baltimore, Ohio

May 21, 2024 11:06 pm

Need A Chiropractor
TOP update from image Dec 2023
The District Update – Water Shed
Ol’ Jenny
June 2023 Left Rail
Size Update
Resize
Fiber Locator
Logo & Info Aug 2023
Sept. 2023
OB You’re Expecting
Logo
Temporary
Sept. 2023

U.S. Route 6: Resurfacing and Bridge Work

U.S. Route 6: Resurfacing and Bridge Work

BOWLING GREEN (Tuesday, April 28, 2015) – The Ohio Department of Transportation (ODOT) District Two announces the start of the US 6 bridge repair project in Wood County:

U.S. Route 6:  Resurfacing and Bridge Work
Wood County (434-14):  Effective Thursday, April 30, through May, US 6, between SR 199 and New Rochester Road will be reduced to one lane in each direction for bridge work.  Traffic will be maintained by automated signal.

 Effective Monday, May 11, through August, US 6, between Rudolph Road and Klopfenstein Road will be reduced to one lane in each direction for bridge repair.  Additional lane restrictions on US 6, between SR 199 and Rudolph Road will be announced.  Project complete:  September.  All work is weather permitting.

Resize
Size Update
Sept. 2023
Sept. 2023
Logo & Info Aug 2023
June 2023 Left Rail
Temporary
Breast Cancer Treatment Rail Ad
Fiber Locator
OB You’re Expecting
Logo
Briar Hill Health Update
Ol’ Jenny

Leave a Reply

Your email address will not be published. Required fields are marked *

NBX powered by PANDA Technologies
NBLS Website